· rebuilt nightly from public records
East Coast Construction holds 3 project permits in Raleigh from the last 12 months (2 in the last 90 days, latest Oct 29, 2026), $1M in estimated cost.
3 project permits in Raleigh over the last 12 months, $1M in estimated cost, from the permits the City of Raleigh publishes: each project, its address and owner, and the trades that pulled permits at the same addresses.
New construction, renovation, structural and demolition permits naming East Coast Construction.
Latest issued Oct 29, 2026As the applicants reported it on these permits.
1 new-construction permitsEvery project permit naming East Coast Construction in the last year.
Project permits naming East Coast Construction as general contractor in the last 12 months, newest first.
| Issued | Address | Type | Est. cost | Work | Owner |
|---|---|---|---|---|---|
| Oct 29, 2026 | 1112 Hardimont Rd | New construction | $853,924 | New Construction Single Family Home; Demo-009150-2026; Crawl space; 2 fireplaces (living r... | MJD North Carolina Properties LLC |
| Sep 2, 2026 | 10711 Bedfordtown Dr | Renovation / alteration | $34,672 | Interior residential remodel. Relocate existing interior wall and relocate existing sink a... | – |
| Aug 13, 2026 | 10609 Silverwood Creek Dr | Renovation / alteration | $124,328 | Existing crawlspace into a finished basement | – |
Owners named on its permits (businesses only), by number of permits.
1112 Hardimont Rd (new construction, $854K), issued Oct 29, 2026; 10711 Bedfordtown Dr (renovation / alteration, $35K), issued Sep 2, 2026; 10609 Silverwood Creek Dr (renovation / alteration, $124K), issued Aug 13, 2026.
3 project permits in the last 12 months and 2 in the last 90 days, as published by the City of Raleigh.
MJD North Carolina Properties LLC (1 permits).
A free Lakewave account shows every new project permit in your territory, the general contractor on each, the trades already on its jobs, and the public bids in the same area.
Create a free accountNew construction and renovation permits in your territory, with the GC, address and estimated cost.
Each general contractor's active projects and the trades already on them.
A permit is the start of a project. Reach the GC while trades are still being lined up.
The same view for public bids, contracts ending and bid results in SLED IQ.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 16, 2026. Permits are as the city published them; estimated costs are as the applicant reported them and are not contract values. General contractors, trades and owners are named as businesses; no individuals are. Check the source before acting. See something wrong? Tell us and we will correct it.