Harvey-cleary Builders: building permits in Austin

Harvey-cleary Builders holds 148 project permits in Austin from the last 12 months (17 in the last 90 days, latest Nov 10, 2026), $63.9B in estimated cost.

148 project permits in Austin over the last 12 months, $63.9B in estimated cost, from the permits the City of Austin Development Services Department publishes: each project, its address and owner, and the trades that pulled permits at the same addresses.

Nov 16, 2026 · updated nightly
For trades and suppliersWhat Harvey-cleary Builders is building
17last 90 days

Project permits

New construction, renovation, structural and demolition permits naming Harvey-cleary Builders.

Latest issued Nov 10, 2026
$63.9B12 months

Estimated cost

As the applicants reported it on these permits.

77 new-construction permits
26trades

On its job sites

Electrical, plumbing, mechanical and other firms with permits at the same addresses.

See every Harvey-cleary Builders project and who is on it →Free account. Opens on Harvey-cleary Builders's permits with the trades and owners on each job.
12 of the last 12 months with a new permit
Email me Harvey-cleary Builders's new permitsOne email a week. No account, no password.

Recent projects

Project permits naming Harvey-cleary Builders as general contractor in the last 12 months, newest first.

IssuedAddressTypeEst. costWork
Nov 10, 2026835 W 6TH ST UNIT 1000Renovation / alteration–Interior Remodel - Close off Convenience Stair.
Nov 8, 2026200 W 6TH ST UNIT FLR21Renovation / alteration–Remodel Existing Admin Shell for Multi-Tenant Corridor - Floor 21
Oct 22, 2026415 COLORADO ST UNIT 1600Renovation / alteration–Texas Capital is only taking half of floor 16. This will consist of offices & open office ...
Oct 22, 2026415 COLORADO ST UNIT 1700Renovation / alteration–Suite 1700 is a full floor tenant suite. Consisting of Client Center Financial center and ...
Oct 1, 2026835 W 6TH ST UNIT 1100Renovation / alteration–Interior Remodel - Restrooms - The Unisex Restroom will remain available while the Men & L...
Oct 1, 2026835 W 6TH ST UNIT 1100Renovation / alteration–Interior Remodel - Office Area Open Office Areas and Breakout Area.
Oct 1, 2026835 W 6TH ST UNIT 1000Renovation / alteration–Interior Remodel - 2 Conference Room Parents Lounge Reception Townhall Break Out Area and ...
Oct 1, 2026835 W 6TH ST UNIT 1000Renovation / alteration–Interior Remodel - Game Testing Coffee Bar and Game Observation Room.
Oct 1, 2026835 W 6TH ST UNIT 1000Renovation / alteration–Interior Remodel - The Unisex Restroom will remain available while the Men & Ladies Room a...
Sep 18, 20267301 METRO CENTER DR UNIT 200Renovation / alteration–ePlan: Commercial Expedited Review - [APPROVED] Phase 2- Interior De- Energized Substation...
Sep 11, 202611500 N MOPAC EXPY SVRD SB BLDG B UNIT FLR4Renovation / alteration–Interior remodel - demolition construction of new ceilings finishes mechanical. electrical...
Sep 11, 202611500 N MOPAC EXPY SVRD SB BLDG B UNIT FLR5Renovation / alteration–Interior remodel - demolition construction of new ceilings finishes mechanical. electrical...
Sep 11, 202611500 N MOPAC EXPY SVRD SB BLDG B UNIT FLR3Renovation / alteration–Interior remodel - demolition construction of new ceilings finishes mechanical. electrical...
Sep 11, 202611500 N MOPAC EXPY SVRD SB BLDG B UNIT FLR2Renovation / alteration–Interior remodel - demolition construction of new ceilings finishes mechanical. electrical...
Sep 9, 202611500 N MOPAC EXPY SVRD SB BLDG B UNIT FLR1Renovation / alteration–Interior remodel - demolition construction of new ceilings finishes mechanical. electrical...
Aug 25, 20267301 METRO CENTER DR UNIT 200Renovation / alteration–ePlan: Commercial Expedited Review - [APPROVED] Phase 1- Interior Remodel with Change of U...
Aug 25, 2026200 W 6TH ST UNIT 2250Renovation / alteration–Interior remodel expansion of an existing office new private offices conference rooms and ...
Jul 22, 20262010 S LAMAR BLVD UNIT 300Renovation / alteration–No construction proposed. CO request to occupy as is. Asking for CO for suite 300 only. Su...
Jul 20, 202610901 STONELAKE BLVD UNIT 100Renovation / alteration–Remodel to first floor to demise amenity space for building which will be available to all...
Jul 20, 2026221 W 6TH ST UNIT 1800Renovation / alteration–interior remodel existing office areas - Phase 1
Jul 10, 2026401 W 4TH ST UNIT 3300Renovation / alteration–TENANT FINISH OUT - LAW OFFICES
Jul 1, 2026221 W 6TH ST UNIT 1700Renovation / alteration–Interior remodel existing office entry areas
Jul 1, 202611500 N MOPAC EXPY SVRD SB BLDG C UNIT FLR1Renovation / alteration–Relocation of Lab Brew Coffee Shop
Jun 18, 202611500 N MOPAC EXPY SVRD SB BLDG B UNIT FLR5Renovation / alteration–interior non structural demolition
Jun 18, 202611500 N MOPAC EXPY SVRD SB BLDG B UNIT FLR4Renovation / alteration–interior non structural demolition
Jun 18, 202611500 N MOPAC EXPY SVRD SB BLDG B UNIT FLR2Renovation / alteration$100interior non structural demolition
Jun 18, 202611500 N MOPAC EXPY SVRD SB BLDG B UNIT FLR3Renovation / alteration$1Interior non-structural demo (3rd floor)
Jun 18, 202611500 N MOPAC EXPY SVRD SB BLDG B UNIT FLR1Renovation / alteration$100interior non structural demolition
Jun 11, 20261115 SAN JACINTO BLVD UNIT 200Renovation / alteration–ePlan: Commercial Expedited Review - Interior Remodel to Existing Office Space.
Jun 11, 20261115 SAN JACINTO BLVD UNIT 200Renovation / alteration$1,000,000ePlan: Commercial Expedited Review - New Addition of Terrace with Lighted Trellis (42425 S...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 11New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 4 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module C.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 13New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 12 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module I.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 1New construction$830,000,000ePlan: Expedited Review - New Construction of Kids Pool.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 18New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 6New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 1New construction$830,000,000ePlan: Expedited Review - New Construction of Upper Clubhouse with Garage.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 11New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 4New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 16New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG GATE2New construction$830,000,000ePlan: Expedited Review - New Construction of Gatehouse - Service and Delivery Entry.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 15New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 6 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module E.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 7 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module F.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 8 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module V.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 5New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 15 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module M and N.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 6New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 18New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG GATE1New construction$830,000,000ePlan: Expedited Review - New Construction of Gatehouse - Residential and Guest Entry.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 1New construction$830,000,000ePlan: Expedited Review - New Construction of Spa.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 1 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Upper Clubhouse Level B1.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 12New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 6New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 2New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Family Bldg. with Parking Garage - L...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG CLUB2New construction$830,000,000ePlan: Expedited Review - New Construction of Clubhouse - Lake Clubhouse.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 16New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 1 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Upper Clubhouse Level B2 - ...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG BDNew construction$830,000,000ePlan: Expedited Review - New Construction of Boat Dock an Amenity Lounge.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 3New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 19New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 5 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module D.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 4New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 8New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 4New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 13New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 16New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 14 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module L.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 15New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 14New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 12New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 13New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 15New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 1New construction$830,000,000ePlan: Expedited Review - New Construction of Vanishing Edge Pool.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 2New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 10New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 17New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 18 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module P and S.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 13 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module J.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 11New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 12New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG CLUB1New construction$830,000,000ePlan: Expedited Review - New Athletic Center and Spa.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 5New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 7New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 7New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 10 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module G and H.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG MAINTNew construction$830,000,000ePlan: Expedited Review - New Construction of Logistics Building.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 9 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module W.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 10New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 3 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module A and B.
Jun 8, 20266915 BRIDGE POINT PKWYNew construction$830,000,000ePlan: Expedited Review - New Construction of Funicular - Upper and Lower Platforms and Pi...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 19New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 17New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 3New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 18New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 1New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 9New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 14New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 10New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 3New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 19New construction$830,000,000ePlan: Expedited Review - New Construction of a Multi-Story Mixed Use Multi-Family Bldg. w...
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 7New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 5New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 14New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 17 UNIT GARNew construction$830,000,000ePlan: Expedited Review - New Construction of Parking Garage - Module O.
Jun 8, 20266915 BRIDGE POINT PKWY BLDG 17New construction$830,000,000ePlan: Expedited Review - New Construction of Pergola - Residential Units.
May 29, 2026200 W 6TH ST UNIT GAR100Renovation / alteration–Conversion of a Garage Basement Storage Room to Office space.
May 11, 20261645 E 6TH ST UNIT 400Renovation / alteration–Interior remodel 4th floor areas. Existing retail.
May 11, 20261645 E 6TH ST UNIT 300Renovation / alteration–Interior remodel 3rd floor areas. Existing retail.
Apr 22, 2026210 W 6TH STRenovation / alteration–Renovations to create moisture barrier for future tenant - Not for Occupancy
Apr 10, 2026415 COLORADO ST UNIT 1300Renovation / alteration–ePlan Review: Demising wall to create suite 1302 added per revision 3
Apr 8, 202610025 ALTERRA PKWY UNIT 100Renovation / alteration–Initial tenant improvement of first-level suite to create B occupancy office space with me...
Mar 30, 202611501 CENTURY OAKS TER BLDG K UNIT 141Renovation / alteration–ePlan: Expedited Review - Interior Remodel to an existing Retail Space (10290 SF).
Mar 3, 2026200 W 6TH ST UNIT 2300Renovation / alteration–7 day finish out for an admin office
Mar 2, 20268201 N FM 620 RD UNIT 100Renovation / alteration–7 DAY - Interior remodel of existing office space. splitting one suite into two (100 and 1...
Mar 2, 20268201 N FM 620 RD UNIT 115Renovation / alteration–7 DAY - Interior remodel of existing office space. splitting one suite into two (100 and 1...
Feb 27, 20261401 E 6TH ST BLDG 1 UNIT 600Renovation / alteration–Interior finish-out of first-generation spec (suite 600)
Feb 26, 202610025 ALTERRA PKWY UNIT 2300Renovation / alteration–Interior remodel existing admin office
Feb 25, 20261312 DALTON LN UNIT 501Renovation / alteration–Remodel and finish out for Light manufacturing. Office area has been previously occupied b...
Feb 24, 202611500 N MOPAC EXPY SVRD SB BLDG C UNIT FLR4Renovation / alteration–INTERIOR REMODEL TO EXISTING OFFICES
Feb 24, 202611500 N MOPAC EXPY SVRD SB BLDG C UNIT FLR2Renovation / alteration–INTERIOR REMODEL TO EXISTING OFFICES
Feb 19, 202611500 N MOPAC EXPY SVRD SB BLDG C UNIT FLR1Renovation / alteration–Interior remodel of existing office space. (Building C Flr 1 5-8) Multi-app - 5 apps
Feb 19, 202611500 N MOPAC EXPY SVRD SB BLDG C UNIT FLR5Renovation / alteration–Interior remodel of existing office space. (Building C Flr 1 5-8) Multi-app - 5 apps
Feb 19, 202611500 N MOPAC EXPY SVRD SB BLDG C UNIT FLR7Renovation / alteration–Interior remodel of existing office space. (Building C Flr 1 5-8) Multi-app - 5 apps
Feb 19, 20261401 E 6TH ST BLDG 1 UNIT FLR6Renovation / alteration–Interior finish out of first generation common corridor (7 day review)
Feb 19, 202611500 N MOPAC EXPY SVRD SB BLDG C UNIT FLR8Renovation / alteration–Interior remodel of existing office space. (Building C Flr 1 5-8) Multi-app - 5 apps
Feb 19, 202611500 N MOPAC EXPY SVRD SB BLDG C UNIT FLR6Renovation / alteration–Interior remodel of existing office space. (Building C Flr 1 5-8) Multi-app - 5 apps
Feb 11, 2026200 W 6TH ST UNIT 2320Renovation / alteration–Finish out for admin office
Feb 10, 20261401 E 6TH ST BLDG 1 UNIT 400Renovation / alteration–Interior remodel to existing office suite to construct 1 small office area. No plumbing sc...
Feb 6, 2026221 W 6TH ST UNIT 300Renovation / alteration–Interior remodel to existing admin offices (suites 300 and 400 - 2 apps)
Feb 6, 2026221 W 6TH ST UNIT 400Renovation / alteration–Interior remodel to existing admin offices (suites 300 and 400 - 2 apps)
Feb 5, 20261312 DALTON LN UNIT 701Renovation / alteration–ePlan Review: Interior Remodel to existing warehouse and distribution center
Jan 29, 2026221 W 6TH ST UNIT 400Renovation / alteration$10,000Interior Non Structural Demo
Jan 29, 2026221 W 6TH ST UNIT 300Renovation / alteration$10,000Interior Non Structural Demo
Jan 28, 2026200 W 6TH ST UNIT 2380Renovation / alteration–Finish out for admin office
Jan 13, 20261306 W OLTORF STRenovation / alteration–Remodel existing admin office building to create sprinkler riser room.
Jan 9, 20261312 DALTON LN UNIT 301Renovation / alteration–Remodel existing accessory fitness area
Jan 7, 202611301 DOMAIN DRRenovation / alteration$1ePlan Review: New Shell Addition to Existing Hotel
Jan 7, 202611301 DOMAIN DRRenovation / alteration–Finish Out of Guest Rooms and Supporting Areas for Floor 7
Jan 7, 202611301 DOMAIN DRRenovation / alteration–Finish Out of Guest Rooms and Supporting Areas for Floor 4
Jan 7, 202611301 DOMAIN DRRenovation / alteration–Finish Out of Guest Rooms and Supporting Areas for Floor 5
Jan 7, 202611301 DOMAIN DRRenovation / alteration–Finish Out of Guest Rooms and Supporting Areas Floor 6
Jan 7, 202611301 DOMAIN DRRenovation / alteration$1ePlan Review: New Open Parking Area
Jan 7, 202611301 DOMAIN DRRenovation / alteration–Finish Out of Guest Rooms and Supporting Areas for Floor 3
Jan 7, 202611301 DOMAIN DRRenovation / alteration–Finish Out of Guest Rooms and Supporting Areas for Floor 2
Dec 11, 20251400 LAVACA ST UNIT 975Renovation / alteration–Office Finish out with offices conference rooms phone rooms open off. Suite 975 only.
Dec 3, 20252170 WOODWARD ST UNIT 100Renovation / alteration–Exterior door access control only
Showing 11 of 148See all 148, free →

Trades on its job sites

Firms that pulled a permit at an address where Harvey-cleary Builders holds a project permit in the last 12 months.

FirmTradePermits
Airco MechanicalMechanical / HVAC36
Kinney's Commercial, IncPlumbing26
Tiger Southwest, LLCElectrical16
S & K Plumbing Of Fort Worth IncPlumbing9
Watt Texas LLC, DBA Edge Electric IncElectrical8
Weifield Group Contracting Texas LLCElectrical8
Hays Electrical Services, IncElectrical8
Rocal Electric GroupElectrical7
Stellar Plumbing IncPlumbing7
Tumlinson ElectricElectrical7
Air Craft Inc. Air Conditioning, RefrigeMechanical / HVAC6
Debusk Electric IncElectrical4
Haegelin Wehmeyer Construction LtdPlumbing3
Young & Pratt, IncPlumbing3
Kilgore Mechanical LLCMechanical / HVAC3
Team Mechanical Of Texas, LLCMechanical / HVAC2
Navejas Electric LLCElectrical2
RHF MechanicalMechanical / HVAC2
MAD Company Mechanical LLCMechanical / HVAC2
Facilities Electric, LLC Dba T-brock Facility SpecialistsElectrical1
Showing 3 of 20See all 20, free →

Month by month

Dec 2025 2Jan 2026 13Feb 2026 16Mar 2026 4Apr 2026 3May 2026 3Jun 2026 84Jul 2026 6Aug 2026 2Sep 2026 6Oct 2026 7Nov 2026 2

Other active general contractors in Austin

GL Hunt Foundation Repair 62Paradisa Homes, LLC 49Pwd-austin, LLC Pella Windows & Doors Of Austin 42Douglas Foundation Repair 41Home Depot USA Inc 39Clark Wilson Builders Inc 35Joseph Design Build 35Olshan Foundation Repair 34OHT Construction LLC 32Trophy Signature Homes 32Foundation Support Specialists 30Novo Construction 28

Common questions

What is Harvey-cleary Builders building in Austin right now?

835 W 6TH ST UNIT 1000 (renovation / alteration), issued Nov 10, 2026; 200 W 6TH ST UNIT FLR21 (renovation / alteration), issued Nov 8, 2026; 415 COLORADO ST UNIT 1600 (renovation / alteration), issued Oct 22, 2026.

How many building permits has Harvey-cleary Builders pulled in Austin?

148 project permits in the last 12 months and 17 in the last 90 days, as published by the City of Austin Development Services Department.

Which trades work on Harvey-cleary Builders's projects?

Airco Mechanical (Mechanical / HVAC); Kinney's Commercial, Inc (Plumbing); Tiger Southwest, LLC (Electrical); S & K Plumbing Of Fort Worth Inc (Plumbing); Watt Texas LLC, DBA Edge Electric Inc (Electrical).

Reach the GC before the trades are pickedCreate a free account →

Related

Hayat HomesHeat Transfer SolutionsHentana Construction LLCHercules Foundation RepairHighland HomesHMI Construction Services

Reach the GC before the trades are picked

A free Lakewave account shows every new project permit in your territory, the general contractor on each, the trades already on its jobs, and the public bids in the same area.

Create a free account

Every new permit, same day

New construction and renovation permits in your territory, with the GC, address and estimated cost.

Know who builds where

Each general contractor's active projects and the trades already on them.

Get on the next job early

A permit is the start of a project. Reach the GC while trades are still being lined up.

Public work too

The same view for public bids, contracts ending and bid results in SLED IQ.

Free account · No credit card · Built from public records, refreshed nightly

Compiled from public records and refreshed nightly; last updated Nov 16, 2026. Permits are as the city published them; estimated costs are as the applicant reported them and are not contract values. General contractors, trades and owners are named as businesses; no individuals are. Check the source before acting. See something wrong? Tell us and we will correct it.