E-rate / Ohio / West Clermont Local Sch Dist

· rebuilt nightly from public records

West Clermont Local Sch Dist E-rate: who serves it, contracts ending, C2 budget left

USAC committed $1.4M to West Clermont Local Sch Dist (Ohio) over FY2024-2026 across 23 funding requests from 5 providers; $852K Category 2 budget is left in the FY2026-2030 cycle, 1 contract ends in the next 12 months and 0 Form 470s are open.

Selling to West Clermont Local Sch Dist? USAC committed $1.4M to it over FY2024-2026, $568K in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.

Ohio · FY2026 · updated nightly from USAC open data
For providers and resellersSelling to West Clermont Local Sch Dist
0open 470s

No 470 open today

When West Clermont Local Sch Dist posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.

$852KC2 budget left

Money still to spend

Category 2 budget left in the FY2026-2030 cycle (Confirmed).

Budget $1.7M
1contracts ending

Within 12 months

E-rate contracts at West Clermont Local Sch Dist that reach their end date in the next year.

Next: Forward Edge, LLC, Sep 30, 2027
See its 470s, incumbents and budget →Free account. Opens on West Clermont Local Sch Dist with every open 470, who holds each service and the Category 2 budget left.
2 of 5 FY2026 requests had a single bidder60% discount rate: pays 40 cents on the dollarIncumbents: Charter Communications Operating, LLC, Forward Edge, LLC, SouthWest Ohio Computer AssociationEmail me when West Clermont Local Sch Dist opens a 470
$1.4M
committed FY2024-2026
23
funding requests
5
providers
$852K
C2 left, FY2026-2030

Commitments by year

Funding yearCommittedFunding requestsProviders
FY2026$568,38353
FY2025$350,22884
FY2024$448,664104

Who serves West Clermont Local Sch Dist

Every provider with a funded request at West Clermont Local Sch Dist in the last three funding years: the incumbents a bid has to displace.

ProviderServicesYearsCommitted FY2024-2026
Forward Edge, LLCInternal connections, Maintenance, Managed Wi-FiFY2024, FY2025, FY2026$1,130,062
SouthWest Ohio Computer AssociationData and internet, Internal connectionsFY2025, FY2026$117,416
Charter Communications Operating, LLCData and internetFY2024, FY2025, FY2026$80,323
Wyebot, Inc.Managed Wi-FiFY2024, FY2025$24,300
ApplianSys LLCInternal connections, MaintenanceFY2024$15,175

Contracts ending in the next 12 months

Contract end dates as filed on the Form 471; June 30 funding-year boundaries are left out.

ProviderServiceCommittedEnds
Forward Edge, LLCInternal connections$343,891Sep 30, 2027

What is already installed

Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.

ManufacturerLine itemsQuantityCostModelsLatest
HPE Aruba33412$800,624HPE Aruba X372 Power Supply 680W, Aruba 2930M 40G 8HPE, Aruba 2930 Stacking ModuleFY2026
Extreme Networks222,455$764,834Extreme Cloud IQ Pilot Tier - EW TAC 1 Year (US K-12), AP4000-WW, XCIQ-PT0-C-EW-5YR-K12:FY2026
APC (Schneider)943$140,176SMTL2200RM2UCNC, SMTL1500RM3UCNC, SMTL3000RM2UCNCFY2026
ApplianSys11$17,778Cachebox 420 (P.N.# 1-CAC-420)FY2024
Fortinet512$15,538FN-TRAN-SFP-SR, FN-TRAN-SFP28- SR, SP-FG400F-PSFY2025
Add-On314$3,003J9151E-AO, J91500-AOFY2025
Fiber - Armoued1600$1,500OM3 MultiMode Fiber Cable Indoor/Outdoor 6-Strand OFPFY2025
Pro Labs15$1,342J9151E-CFY2026
Cat 6A Data Drop for Wireless Access Point13$1,320Cat 6A Data Drop for Wireless Access PointFY2025
Palo Alto Networks14$1,046JL669BFY2026
Corning41,214$947OS1 OFNP Plenum 6-strand Singlemode fiber optic cable, Duplex Fiber Jumper Cable LC-LC OS1 Singlemode 2meter, Fiber Patch Panel 3 Duplex OS1/2FY2024
Eaton11$615SmartRack 12U UPS-Depth Wall-Mount Small Rack Enclosure,FY2025
Fiber Enclosure Rack Mount 3 LGX Panel lRU12$451Fiber Enclosure Rack Mount 3 LGX Panel lRUFY2025
Leviton26$447Fiber Panel Blank Black, Fiber Cable Enclosure 3 LGX Panel 1 Rack UnitFY2024
Altitude12$1544760 12 inch extension arm for mounting kitFY2025
Fiber Panel 3 Duplex LC OM3/4 Aqua12$60Fiber Panel 3 Duplex LC OM3/4 AquaFY2025
Fiber Pigtail 6 LC MM OM3 3 Meter12$48Fiber Pigtail 6 LC MM OM3 3 MeterFY2025
24-Port High-Density Field-Configurable Unloaded Multimedia Panel11$4524-Port High-Density Field-Configurable Unloaded Multimedia PanelFY2025
Fiber Jumper Duplex LC-LC OM3 50 MM l0gig - 2 Meter12$36Fiber Jumper Duplex LC-LC OM3 50 MM l0gig - 2 MeterFY2025
Fiber Panel Blank Black14$27Fiber Panel Blank BlackFY2025

Category 2 budget

CycleBudgetLeftStatusConsultant on file
FY2026-2030$1,655,293$852,205ConfirmedEducation Plus

Common questions

Who provides E-rate services to West Clermont Local Sch Dist?

Forward Edge, LLC (Internal connections, Maintenance, Managed Wi-Fi, $1.1M); SouthWest Ohio Computer Association (Data and internet, Internal connections, $117K); Charter Communications Operating, LLC (Data and internet, $80K); Wyebot, Inc. (Managed Wi-Fi, $24K); ApplianSys LLC (Internal connections, Maintenance, $15K).

How much E-rate Category 2 budget does West Clermont Local Sch Dist have left?

$852K of a $1.7M budget in the FY2026-2030 cycle (Confirmed), as of Nov 5, 2026.

Which of West Clermont Local Sch Dist's E-rate contracts end soon?

Forward Edge, LLC, Internal connections, ends Sep 30, 2027.

What network equipment does West Clermont Local Sch Dist use?

HPE Aruba (33 line items); Extreme Networks (22 line items); APC (Schneider) (9 line items); ApplianSys (1 line items); Fortinet (5 line items), from Form 471 line items FY2024-2026.

Does West Clermont Local Sch Dist have an E-rate Form 470 open right now?

Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.

Win the next E-rate cycle

Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.

Create a free account

Catch every Form 470

See the 470s open in your territory, what each district runs today, and whether it names a brand.

Displace incumbents

See which provider serves each district, what it bought, and when the contract ends.

Find C2 money left

See how much Category 2 budget each district has left in the FY2026-2030 cycle.

Price to win

See the unit prices districts actually paid, by model, from E-rate line items.

Free account · No credit card · Built from public records, refreshed nightly

Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.