· rebuilt nightly from public records
USAC committed $1.9M to Pender County School District (North Carolina) over FY2024-2026 across 7 funding requests from 3 providers; $2.3M Category 2 budget is left in the FY2026-2030 cycle, 0 contracts end in the next 12 months and 0 Form 470s are open.
Selling to Pender County School District? USAC committed $1.9M to it over FY2024-2026, $253K in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.
When Pender County School District posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.
Category 2 budget left in the FY2026-2030 cycle (Confirmed).
Budget $2.3ME-rate contracts at Pender County School District that reach their end date in the next year.
| Funding year | Committed | Funding requests | Providers |
|---|---|---|---|
| FY2026 | $252,900 | 2 | 2 |
| FY2025 | $291,444 | 2 | 2 |
| FY2024 | $1,305,885 | 3 | 3 |
Every provider with a funded request at Pender County School District in the last three funding years: the incumbents a bid has to displace.
| Provider | Services | Years | Committed FY2024-2026 |
|---|---|---|---|
| CNIC, Inc. | Internal connections | FY2024 | $861,293 |
| True IP Solutions LLC | Data and internet | FY2024, FY2025, FY2026 | $568,887 |
| Applied Network Consulting Group | Internal connections | FY2024, FY2025, FY2026 | $420,049 |
Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.
| Manufacturer | Line items | Quantity | Cost | Models | Latest |
|---|---|---|---|---|---|
| Extreme Networks | 22 | 1,834 | $1,008,732 | Extreme Cat 6 UTP Channel-Rated Quickport Connector, 1Pk, Blue, 10061.0, XCIQ-PT053-C-EW-5YK12 | FY2025 |
| Corning | 9 | 12,315 | $66,804 | Corning 12 Strand Tight Buffered Interlocking Multimode (OM3) 50 Micron Riser Fiber, Aqua, Corning 12 Strand Tight Buffered Multimode (OM3) 50 Micron Riser Fiber, Black, CCH Panel, LC Adapter, Duplex, 6 Strand Multimode (OM3/4) 50 Micron, Ceramic Insert, 1Pk, Aqua | FY2024 |
| HPE Aruba | 1 | 912 | $61,560 | Aruba Central AP Foundation Subscription 1 year | FY2026 |
| Freedom One | 1 | 12,950 | $41,570 | Freedm One Tight-Buffered, Interlocking Armored Cable, Riser 12 F, 50 µm multimode (OM3) | FY2024 |
| LANmark | 2 | 112 | $36,612 | LANmark-6 Cat6 Riser 4-Pair UTP, Blue 1,000FT | FY2025 |
| Eaton | 3 | 215 | $18,321 | J Hook 2" Beam Fasteners Flange 1/8" to 1/4", 10Pk, J Hook 2" Beam Fasteners Flange 1/8" to 1/4", Rotatable Hammer On Cable to Beam Fastener 4 in., for 1/8 to 1/4 in. Flange | FY2024 |
| Unicam | 2 | 114 | $14,941 | Unicam High-Performance Connector LC Multimode (OM3/OM4) 50 Micron, Ceramic Ferrule, 1Pk, Black Housing & Aqua Boot, Unicam High-Performance Connector LC Multimode (OM3/OM4) 50 Micron, Ceramic Ferrule, 25Pk | FY2024 |
| STI | 10 | 217 | $13,084 | FIRE-PUTTY, STI Smooth Firestop Sleeve 2", STI Smooth Firestop Sleeve 1" | FY2025 |
| Legrand | 2 | 177 | $5,784 | 10301-A, 10051H-A | FY2024 |
| Erico | 4 | 750 | $5,112 | Erico 2" J-Hook, Erico 4" J-Hook | FY2025 |
| Caddy | 2 | 800 | $2,024 | Caddy J Hooks | FY2025 |
| Coyote | 2 | 12 | $1,466 | Fiber Outdoor Splice Enclosure, Fiber Outdoor Splice Tray | FY2024 |
| Hubbell | 4 | 11 | $1,272 | Hubbell 48-Port Unloaded Patch Panel, Hubbell 24-Port Unloaded Patch Panel | FY2025 |
| Leviton | 5 | 143 | $440 | Leviton 2 Port Faceplate White, Leviton 1 Port Faceplate White, Leviton 2 Port Surface Mount Box White | FY2025 |
| Graybar | 1 | 1 | $79 | Poly Line Fish Tape | FY2024 |
| Cycle | Budget | Left | Status | Consultant on file |
|---|---|---|---|---|
| FY2026-2030 | $2,319,264 | $2,253,549 | Confirmed | – |
CNIC, Inc. (Internal connections, $861K); True IP Solutions LLC (Data and internet, $569K); Applied Network Consulting Group (Internal connections, $420K).
$2.3M of a $2.3M budget in the FY2026-2030 cycle (Confirmed), as of Nov 5, 2026.
Extreme Networks (22 line items); Corning (9 line items); HPE Aruba (1 line items); Freedom One (1 line items); LANmark (2 line items), from Form 471 line items FY2024-2026.
Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.
Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.
Create a free accountSee the 470s open in your territory, what each district runs today, and whether it names a brand.
See which provider serves each district, what it bought, and when the contract ends.
See how much Category 2 budget each district has left in the FY2026-2030 cycle.
See the unit prices districts actually paid, by model, from E-rate line items.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.