E-rate / Iowa / Ottumwa Comm School District

· rebuilt nightly from public records

Ottumwa Comm School District E-rate: who serves it, contracts ending, C2 budget left

USAC committed $1.1M to Ottumwa Comm School District (Iowa) over FY2024-2026 across 43 funding requests from 9 providers; $415K Category 2 budget is left in the FY2026-2030 cycle, 0 contracts end in the next 12 months and 0 Form 470s are open.

Selling to Ottumwa Comm School District? USAC committed $1.1M to it over FY2024-2026, $529K in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.

Iowa · FY2026 · updated nightly from USAC open data
For providers and resellersSelling to Ottumwa Comm School District
0open 470s

No 470 open today

When Ottumwa Comm School District posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.

$415KC2 budget left

Money still to spend

Category 2 budget left in the FY2026-2030 cycle (Confirmed).

Budget $947K
0contracts ending

Within 12 months

E-rate contracts at Ottumwa Comm School District that reach their end date in the next year.

See its 470s, incumbents and budget →Free account. Opens on Ottumwa Comm School District with every open 470, who holds each service and the Category 2 budget left.
1 of 12 FY2026 requests had a single bidder90% discount rate: pays 10 cents on the dollarIncumbents: AMCO HBS Holdings LP, Communications Engineering Company, ESCO ELECTRIC COMPANY, MAHASKA COMMUNICATION GROUP, LLCEmail me when Ottumwa Comm School District opens a 470
$1.1M
committed FY2024-2026
43
funding requests
9
providers
$415K
C2 left, FY2026-2030

Commitments by year

Funding yearCommittedFunding requestsProviders
FY2026$528,916126
FY2025$133,777124
FY2024$437,624193

Who serves Ottumwa Comm School District

Every provider with a funded request at Ottumwa Comm School District in the last three funding years: the incumbents a bid has to displace.

ProviderServicesYearsCommitted FY2024-2026
AMCO HBS Holdings LPInternal connections, MaintenanceFY2024, FY2025, FY2026$711,838
MCC Telephony, LLCData and internetFY2024, FY2025, FY2026$247,680
Van Maanen ElectricInternal connectionsFY2024$71,612
MAHASKA COMMUNICATION GROUP, LLCData and internet, Internal connectionsFY2026$21,507
Communications Engineering CompanyInternal connectionsFY2026$20,553
Van Maanen TechnologyInternal connections, MaintenanceFY2025$15,756
SHI International CorpoInternal connectionsFY2025$5,324
ESCO ELECTRIC COMPANYInternal connectionsFY2026$3,442
Winger Contracting CompanyInternal connectionsFY2026$2,605

What is already installed

Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.

ManufacturerLine itemsQuantityCostModelsLatest
HPE Aruba751,014$805,148Q9Y62AAE, JL087A, S0H13AFY2026
Panduit27593$68,452CJ6X88TGOR, CJS6X88TGBUY, CJ688TGORFY2026
Fortinet57$21,343FC-10-0061F-247-02-60, FC-10-GT71G-247-02-60, FG-61FFY2026
Equal Optics1150$6,946J9150D-EO, J9152D-EOFY2024
Corning7308$5,703006TU4-T4790D20, CCH-CP06-E4, FAN-BT25-06FY2026
Vertiv12$4,990GXT5LI-2000LVRT2UXLNFY2025
Ubiquiti1031$3,042UB-AM, NS-5AC-US, USW-FLEX-2.5G-8-POEFY2026
Legrand14520$2,0766AM130-001, 6AM110-001, 6AM190-001FY2025
Cisco33$1,094EDU-DNA-E-3Y, C9120AXE-B-EDU, AIR-ANT2566P4W-RS=FY2025
Connectors, Coupler Panels, Jumpers11$960Connectors, Coupler Panels, JumpersFY2025
NB141207-1HFS Enclosure11$812NB141207-1HFS EnclosureFY2025
Rack Fiber Housing (CCH-01U)11$776Rack Fiber Housing (CCH-01U)FY2025
L-com11$704NB141207-1HFSFY2026
ESCO11$625MaterialFY2026
VMP11$623VMP ERWEN-12FY2026
CPI, TripLite11$620Wire Manager, RS-1215-20TFY2024
Chatsworth416$56710642-001, 11309-701, 10250-712FY2025
CADDY4250$563CJ32H, 531FY2026
General Cable11$4407136100FY2026
Jacks Cat6, Category 6 Shieled Cabling11$387Jacks Cat6, Category 6 Shieled CablingFY2025
FuseLite217$299SOC-LC-900-OM4FY2026
StarTech116$299RPSMA10MFFY2026
Jacks and Patch Panel11$250Jacks and Patch PanelFY2025
Not Listed12$57050502Q5120001MFY2026
Tripp Lite (Eaton)12–RS-1215-20TFY2025

Category 2 budget

CycleBudgetLeftStatusConsultant on file
FY2026-2030$946,573$415,425ConfirmedIowa AEA E-Rate Consulting; eRate Solutions, L.L.C

Common questions

Who provides E-rate services to Ottumwa Comm School District?

AMCO HBS Holdings LP (Internal connections, Maintenance, $712K); MCC Telephony, LLC (Data and internet, $248K); Van Maanen Electric (Internal connections, $72K); MAHASKA COMMUNICATION GROUP, LLC (Data and internet, Internal connections, $22K); Communications Engineering Company (Internal connections, $21K).

How much E-rate Category 2 budget does Ottumwa Comm School District have left?

$415K of a $947K budget in the FY2026-2030 cycle (Confirmed), as of Nov 5, 2026.

What network equipment does Ottumwa Comm School District use?

HPE Aruba (75 line items); Panduit (27 line items); Fortinet (5 line items); Equal Optics (11 line items); Corning (7 line items), from Form 471 line items FY2024-2026.

Does Ottumwa Comm School District have an E-rate Form 470 open right now?

Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.

Win the next E-rate cycle

Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.

Create a free account

Catch every Form 470

See the 470s open in your territory, what each district runs today, and whether it names a brand.

Displace incumbents

See which provider serves each district, what it bought, and when the contract ends.

Find C2 money left

See how much Category 2 budget each district has left in the FY2026-2030 cycle.

Price to win

See the unit prices districts actually paid, by model, from E-rate line items.

Free account · No credit card · Built from public records, refreshed nightly

Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.