· rebuilt nightly from public records
USAC committed $1.6M to Jenks Indep School District 5 (Oklahoma) over FY2024-2026 across 21 funding requests from 4 providers; $2M Category 2 budget is left in the FY2026-2030 cycle, 0 contracts end in the next 12 months and 0 Form 470s are open.
Selling to Jenks Indep School District 5? USAC committed $1.6M to it over FY2024-2026, $478K in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.
When Jenks Indep School District 5 posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.
Category 2 budget left in the FY2026-2030 cycle (Confirmed).
Budget $2.3ME-rate contracts at Jenks Indep School District 5 that reach their end date in the next year.
| Funding year | Committed | Funding requests | Providers |
|---|---|---|---|
| FY2026 | $477,735 | 7 | 3 |
| FY2025 | $463,562 | 5 | 4 |
| FY2024 | $660,097 | 9 | 3 |
Every provider with a funded request at Jenks Indep School District 5 in the last three funding years: the incumbents a bid has to displace.
| Provider | Services | Years | Committed FY2024-2026 |
|---|---|---|---|
| GigaPop Internet Services LLC | Data and internet, Internal connections | FY2024, FY2025, FY2026 | $975,255 |
| NetFabric | Internal connections, Managed Wi-Fi | FY2024, FY2025, FY2026 | $488,265 |
| Cox Oklahoma Telcom, LLC | Data and internet | FY2024, FY2025, FY2026 | $110,875 |
| Chickasaw Telecom, Inc. | Internal connections | FY2025 | $27,000 |
Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.
| Manufacturer | Line items | Quantity | Cost | Models | Latest |
|---|---|---|---|---|---|
| Juniper Networks | 6 | 125 | $113,477 | S-EX-S-C3-5M1-C-E, EX3400-48P, (Jenks Indep School District 5 140075) EX-SFP-10GE DAC-1M | SFP+, 10GE Direct Attach Copper Cable, 1 meter, Standard Temperature (0 through 70 DEGREE C), 0.57W, 30 AWG | FY2026 |
| Segment 1 | 5 | 5 | $103,327 | (JENK 140075) | Segment 1 Underground conduit and fiber construction with termination, (JENK 140075) | Segment 1 Underground counduit and fiber construction with termination | FY2024 |
| Segment 2 | 3 | 3 | $102,155 | (JENK 140075) | Segment 2 Underground conduit and fiber construction with termination, (JENK 140075) | Segment 2 Underground counduit and fiber construction with termination | FY2024 |
| APC (Schneider) | 2 | 40 | $96,830 | ( 0) SRT2200RMXLA NC | APC Smart-UPS On-Line, 2200VA, Rackmount 2U, 120V, 6x 5-20R+1x L5-20R NEMA outlets, Network Card, Extended runtime, W/ rail kit - Ideal for servers, storage, voice/data networks, medical labs, and light industrial applications, SRT2200RMXLA-NC | FY2026 |
| SM Fiber | 2 | 2 | $72,350 | (JENK 140075) | Cabling and patch panels, (JENK 140075) 950' 12 count SM Fiber | SM fiber internal run to support building to building design | FY2024 |
| 10G Optic | 7 | 181 | $54,300 | (JENK 140075) | 10G Optic | FY2024 |
| Segment 3 | 1 | 1 | $22,314 | (JENK 140075) | Segment 3 Underground conduit and fiber construction with termination | FY2024 |
| Patch Pannel | 5 | 28 | $11,200 | (JENK 140075) | Patch Panel | FY2024 |
| Segment 0 | 1 | 1 | $10,520 | (JENK 140075) | Segment 0 Underground conduit and fiber construction with termination | FY2024 |
| Patch Cable | 7 | 209 | $2,717 | (JENK 140075) | Patch Cable | FY2024 |
| Cabinet | 2 | 3 | $1,200 | (JENK 140075) | Cabinet required | FY2024 |
| Cycle | Budget | Left | Status | Consultant on file |
|---|---|---|---|---|
| FY2026-2030 | $2,332,568 | $1,979,302 | Confirmed | Kellogg & Sovereign Consulting |
GigaPop Internet Services LLC (Data and internet, Internal connections, $975K); NetFabric (Internal connections, Managed Wi-Fi, $488K); Cox Oklahoma Telcom, LLC (Data and internet, $111K); Chickasaw Telecom, Inc. (Internal connections, $27K).
$2M of a $2.3M budget in the FY2026-2030 cycle (Confirmed), as of Nov 5, 2026.
Juniper Networks (6 line items); Segment 1 (5 line items); Segment 2 (3 line items); APC (Schneider) (2 line items); SM Fiber (2 line items), from Form 471 line items FY2024-2026.
Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.
Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.
Create a free accountSee the 470s open in your territory, what each district runs today, and whether it names a brand.
See which provider serves each district, what it bought, and when the contract ends.
See how much Category 2 budget each district has left in the FY2026-2030 cycle.
See the unit prices districts actually paid, by model, from E-rate line items.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.