E-rate / New Mexico / Farmington Muncpl Sch Dist 5

· rebuilt nightly from public records

Farmington Muncpl Sch Dist 5 E-rate: who serves it, contracts ending, C2 budget left

USAC committed $1.6M to Farmington Muncpl Sch Dist 5 (New Mexico) over FY2024-2026 across 14 funding requests from 4 providers; $1.9M Category 2 budget is left in the FY2026-2030 cycle, 1 contract ends in the next 12 months and 0 Form 470s are open.

Selling to Farmington Muncpl Sch Dist 5? USAC committed $1.6M to it over FY2024-2026, $462K in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.

New Mexico · FY2026 · updated nightly from USAC open data
For providers and resellersSelling to Farmington Muncpl Sch Dist 5
0open 470s

No 470 open today

When Farmington Muncpl Sch Dist 5 posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.

$1.9MC2 budget left

Money still to spend

Category 2 budget left in the FY2026-2030 cycle (Preliminary).

Budget $2.3M
1contracts ending

Within 12 months

E-rate contracts at Farmington Muncpl Sch Dist 5 that reach their end date in the next year.

Next: Network Cabling, Inc., Sep 30, 2027
See its 470s, incumbents and budget →Free account. Opens on Farmington Muncpl Sch Dist 5 with every open 470, who holds each service and the Category 2 budget left.
1 of 6 FY2026 requests had a single bidder90% discount rate: pays 10 cents on the dollarIncumbents: Network Cabling, Inc., Vero Fiber NetworksEmail me when Farmington Muncpl Sch Dist 5 opens a 470
$1.6M
committed FY2024-2026
14
funding requests
4
providers
$1.9M
C2 left, FY2026-2030

Commitments by year

Funding yearCommittedFunding requestsProviders
FY2026$462,33062
FY2025$1,035,06653
FY2024$88,65733

Who serves Farmington Muncpl Sch Dist 5

Every provider with a funded request at Farmington Muncpl Sch Dist 5 in the last three funding years: the incumbents a bid has to displace.

ProviderServicesYearsCommitted FY2024-2026
Abba Technologies, Inc.Internal connections, MaintenanceFY2025$796,510
Network Cabling, Inc.Data and internet, Internal connectionsFY2024, FY2025, FY2026$655,330
Vero Fiber NetworksData and internetFY2024, FY2025, FY2026$98,850
Kajeet, Inc.Data and internetFY2024$35,362

Contracts ending in the next 12 months

Contract end dates as filed on the Form 471; June 30 funding-year boundaries are left out.

ProviderServiceCommittedEnds
Network Cabling, Inc.Internal connections$150,975Sep 30, 2027

What is already installed

Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.

ManufacturerLine itemsQuantityCostModelsLatest
Fortinet5513$614,781FN-TRAN-SFP+SR 10GE SFP+ transceiver module, short range 10 GE SFP+ transceiver module, short range 300m, LC connector, MMF, 850nm, 0C to 70C, for systems with SFP+ slots, FS-448E-FPOE Switch - FORTISWITCH 448E-FPOE - 1RU - Wired - 48x GE RJ45 and 4x 10GE SFP+ ports, FN-TRAN-SFP+LR 10GE SFP+ transceiver module, long range 10 GE SFP+ transceiver module, long range 10km, LC connector, SMF, 1310nm, 0C to 85C, for systems with SFP+ slotsFY2025
Cat6A Cabling190,375$57,840CAT6A CABLINGFY2025
CAT6A1403$4,433CAT6A JackFY2025
C6A214$4,40048 PORT C6A PATCH PANELFY2025
Blue 10Ft Patch Cable1236$3,304BLUE 10FT PATCH CABLEFY2025
Blue 3Ft Patch Cable1236$2,832BLUE 3FT PATCH CABLEFY2025
Network Rack15$1,590NETWORK RACKFY2025
Green 10Ft Patch Cable1112$1,568GREEN 10FT PATCH CABLEFY2025
Purple 10Ft Patch Cable1109$1,526PURPLE 10FT PATCH CABLEFY2025
Green 3Ft Patch Cable1112$1,344GREEN 3FT PATCH CABLEFY2025
Purple 3Ft Patch Cable1109$1,308PURPLE 3FT PATCH CABLEFY2025
Yellow 10Ft Patch Cable157$798YELLOW 10FT PATCH CABLEFY2025
Yellow 3Ft Patch Cable157$684YELLOW 3FT PATCH CABLEFY2025
2-Post Rack11$3182-POST RACKFY2025
Surface Jack149$196Surface JackFY2025
Black 10Ft Patch Cable112$168BLACK 10FT PATCH CABLEFY2025
Black 3Ft Patch Cable112$144BLACK 3FT PATCH CABLEFY2025
Red 10Ft Patch Cable13$42RED 10FT PATCH CABLEFY2025
Red 3Ft Patch Cable13$36RED 3FT PATCH CABLEFY2025

Category 2 budget

CycleBudgetLeftStatusConsultant on file
FY2026-2030$2,267,058$1,878,512PreliminaryE-Rate Central

Common questions

Who provides E-rate services to Farmington Muncpl Sch Dist 5?

Abba Technologies, Inc. (Internal connections, Maintenance, $797K); Network Cabling, Inc. (Data and internet, Internal connections, $655K); Vero Fiber Networks (Data and internet, $99K); Kajeet, Inc. (Data and internet, $35K).

How much E-rate Category 2 budget does Farmington Muncpl Sch Dist 5 have left?

$1.9M of a $2.3M budget in the FY2026-2030 cycle (Preliminary), as of Nov 5, 2026.

Which of Farmington Muncpl Sch Dist 5's E-rate contracts end soon?

Network Cabling, Inc., Internal connections, ends Sep 30, 2027.

What network equipment does Farmington Muncpl Sch Dist 5 use?

Fortinet (5 line items); Cat6A Cabling (1 line items); CAT6A (1 line items); C6A (2 line items); Blue 10Ft Patch Cable (1 line items), from Form 471 line items FY2024-2026.

Does Farmington Muncpl Sch Dist 5 have an E-rate Form 470 open right now?

Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.

Win the next E-rate cycle

Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.

Create a free account

Catch every Form 470

See the 470s open in your territory, what each district runs today, and whether it names a brand.

Displace incumbents

See which provider serves each district, what it bought, and when the contract ends.

Find C2 money left

See how much Category 2 budget each district has left in the FY2026-2030 cycle.

Price to win

See the unit prices districts actually paid, by model, from E-rate line items.

Free account · No credit card · Built from public records, refreshed nightly

Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.