· rebuilt nightly from public records
Green Valley Corp holds 7 project permits in San Jose from the last 12 months (1 in the last 90 days, latest Oct 13, 2026), $67.2M in estimated cost.
7 project permits in San Jose over the last 12 months, $67.2M in estimated cost, from the permits the City of San Jose Planning, Building and Code Enforcement publishes: each project, its address and owner, and the trades that pulled permits at the same addresses.
New construction, renovation, structural and demolition permits naming Green Valley Corp.
Latest issued Oct 13, 2026As the applicants reported it on these permits.
5 new-construction permitsElectrical, plumbing, mechanical and other firms with permits at the same addresses.
Project permits naming Green Valley Corp as general contractor in the last 12 months, newest first.
| Issued | Address | Type | Est. cost | Work | Owner |
|---|---|---|---|---|---|
| Oct 13, 2026 | 1655 BERRYESSA RD | Renovation / alteration | $63,000 | BERRYESSA FAMILY APTS (BE100%) 1000AMP TEMP POWER | – |
| Aug 10, 2026 | 498 W SAN CARLOS ST | Renovation / alteration | $420,000 | (BE 100%) INSTALL CAR PARKING LIFTS STACKER SYSTEM | UC Madera Owner LLC |
| May 4, 2026 | 1 BERNARD DR | New construction | $52,395,660 | BERRYESSA FAMILY APT (BEMP 100%) NEW CONSTRUCTION | – |
| May 4, 2026 | 1655 BERRYESSA RD | New construction | $8,893,633 | BERRYESSA FAMILY APT(BEMP 100%) NEW GARAGE | – |
| Dec 23, 2025 | 6125 SNELL AV | New construction | $1,791,880 | SANTA TERESA (BEPM 100%) NEW APARTMENT BLDG 1 | Santa Teresa LP |
| Dec 23, 2025 | 6127 SNELL AV | New construction | $2,065,269 | SANTA TERESA (BEPM 100%) NEW APARTMENT BUILDING 2 | Santa Teresa LP |
| Dec 23, 2025 | 6129 SNELL AV | New construction | $1,580,338 | SANTA TERESA (BEPM 100%) NEW APARTMENT BUILDING 3 | Santa Teresa LP |
Firms that pulled a permit at an address where Green Valley Corp holds a project permit in the last 12 months.
| Firm | Trade | Permits |
|---|---|---|
| Power Plus | Other trade | 1 |
Owners named on its permits (businesses only), by number of permits.
1655 BERRYESSA RD (renovation / alteration, $63K), issued Oct 13, 2026; 498 W SAN CARLOS ST (renovation / alteration, $420K), issued Aug 10, 2026; 1 BERNARD DR (new construction, $52.4M), issued May 4, 2026.
7 project permits in the last 12 months and 1 in the last 90 days, as published by the City of San Jose Planning, Building and Code Enforcement.
Power Plus (Other trade).
Santa Teresa LP (3 permits); UC Madera Owner LLC (1 permits).
A free Lakewave account shows every new project permit in your territory, the general contractor on each, the trades already on its jobs, and the public bids in the same area.
Create a free accountNew construction and renovation permits in your territory, with the GC, address and estimated cost.
Each general contractor's active projects and the trades already on them.
A permit is the start of a project. Reach the GC while trades are still being lined up.
The same view for public bids, contracts ending and bid results in SLED IQ.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 16, 2026. Permits are as the city published them; estimated costs are as the applicant reported them and are not contract values. General contractors, trades and owners are named as businesses; no individuals are. Check the source before acting. See something wrong? Tell us and we will correct it.