· rebuilt nightly from public records
Metcon Ti, Inc holds 21 project permits in San Francisco from the last 12 months (3 in the last 90 days, latest Sep 23, 2026), $10.4M in estimated cost.
21 project permits in San Francisco over the last 12 months, $10.4M in estimated cost, from the permits the San Francisco Department of Building Inspection publishes: each project, its address and owner, and the trades that pulled permits at the same addresses.
New construction, renovation, structural and demolition permits naming Metcon Ti, Inc.
Latest issued Sep 23, 2026As the applicants reported it on these permits.
Every project permit naming Metcon Ti, Inc in the last year.
Project permits naming Metcon Ti, Inc as general contractor in the last 12 months, newest first.
| Issued | Address | Type | Est. cost | Work |
|---|---|---|---|---|
| Sep 23, 2026 | 1680 Eddy St | Renovation / alteration | $175,871 | expansion of 3 electrical rooms to allow new switch gear. extension of concrete pod at ext... |
| Sep 21, 2026 | 180 Howard St | Renovation / alteration | $150,000 | mechanical-install new low pressure duct & air distribution to meet new layout. install (3... |
| Sep 21, 2026 | 180 Howard St | Renovation / alteration | $576,000 | mechanical: install (n) low-pressure duct and air distribution to meet new ti layout. inst... |
| Aug 12, 2026 | 180 Howard St | Renovation / alteration | $1 | 9th fl - structural only permit submittal to show structural drawings and calcs for movabl... |
| Jul 24, 2026 | 180 Howard St | Renovation / alteration | $10,000 | 2nd floor: anchoring of existing one person furniture phone booths. new signage to designa... |
| Jul 13, 2026 | 33 New Montgomery St | Renovation / alteration | $650,000 | 18th floor, suites 1810 and 1840: market ready improvement for office suite(4,500 sf)combi... |
| Jul 13, 2026 | 33 New Montgomery St | Renovation / alteration | $238,710 | ste. #350: lounge improvement for building amenity space. new walls, lighting, floor finis... |
| Jul 13, 2026 | 180 Howard St | Renovation / alteration | $250,000 | 9th flr: deferred mep drawings. mech-install new low pressure duct & air distribution to m... |
| Jun 11, 2026 | 33 New Montgomery St | Renovation / alteration | $190,000 | 9/f: mep deferred submittal to support approved architecutral permit. ref 202512040978 and... |
| Jun 8, 2026 | 570 Battery St | Renovation / alteration | $804,202 | combine two commercial suites 560 and 570 to be used as one commercial space. remodel exis... |
| Jun 2, 2026 | 33 New Montgomery St | Renovation / alteration | $55,000 | 9/f: rev 202512040978 to add illuminated exit signage to t.i. electrical deferred under th... |
| Jun 1, 2026 | 180 Howard St | Renovation / alteration | $1,300,000 | 10/fl- ti and selective soft demo and construction of non structural partitions, new finis... |
| Jun 1, 2026 | 180 Howard St | Renovation / alteration | $1,340,000 | 12/fl ste 1200 - ti and selective soft demo and construction of non structural partitions,... |
| May 20, 2026 | 180 Howard St | Renovation / alteration | $1 | 9th/f: revision to 202512041010: floor will be converted to 1 full-floor suite in lieu of ... |
| Mar 18, 2026 | 180 Howard St | Renovation / alteration | $210,000 | 8/fl: mech:replace low pressure ductwork for whole floor, install 6 new terminal units. el... |
| Jan 9, 2026 | 2000 Fillmore St | Renovation / alteration | $30,000 | install (n) non load bearing walls. (e) restrooms and plumbing fixtures to remain. install... |
| Jan 9, 2026 | 180 Howard St | Renovation / alteration | $750,000 | 9/f: tenant improvement to include new partitions, offices, and conference rooms. mep defe... |
| Jan 8, 2026 | 180 Howard St | Renovation / alteration | $1,750,000 | 8th floor tenant improvement, selective demolition and construction of non structural part... |
| Dec 19, 2025 | 33 New Montgomery St | Renovation / alteration | $1,800,000 | 9th/f t.i. new partitions, offices, conference rooms, and 14 new phone booths. mep deferre... |
| Dec 3, 2025 | 180 Howard St | Renovation / alteration | $30,000 | 7/f: deferred mep for ti# 202509044560. replace (e) plumbing fixtures at break froom 7506,... |
| Dec 2, 2025 | 1 Lombard St | Renovation / alteration | $50,000 | deferred plumbing: replace (e) drinking fountain at 1st fl and (e) drinking fountain at me... |
1680 Eddy St (renovation / alteration, $176K), issued Sep 23, 2026; 180 Howard St (renovation / alteration, $150K), issued Sep 21, 2026; 180 Howard St (renovation / alteration, $576K), issued Sep 21, 2026.
21 project permits in the last 12 months and 3 in the last 90 days, as published by the San Francisco Department of Building Inspection.
A free Lakewave account shows every new project permit in your territory, the general contractor on each, the trades already on its jobs, and the public bids in the same area.
Create a free accountNew construction and renovation permits in your territory, with the GC, address and estimated cost.
Each general contractor's active projects and the trades already on them.
A permit is the start of a project. Reach the GC while trades are still being lined up.
The same view for public bids, contracts ending and bid results in SLED IQ.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 16, 2026. Permits are as the city published them; estimated costs are as the applicant reported them and are not contract values. General contractors, trades and owners are named as businesses; no individuals are. Check the source before acting. See something wrong? Tell us and we will correct it.