· rebuilt nightly from public records
Lemus Construction Co holds 16 project permits in San Francisco from the last 12 months (5 in the last 90 days, latest Nov 2, 2026), $392K in estimated cost.
16 project permits in San Francisco over the last 12 months, $392K in estimated cost, from the permits the San Francisco Department of Building Inspection publishes: each project, its address and owner, and the trades that pulled permits at the same addresses.
New construction, renovation, structural and demolition permits naming Lemus Construction Co.
Latest issued Nov 2, 2026As the applicants reported it on these permits.
Every project permit naming Lemus Construction Co in the last year.
Project permits naming Lemus Construction Co as general contractor in the last 12 months, newest first.
| Issued | Address | Type | Est. cost | Work |
|---|---|---|---|---|
| Nov 2, 2026 | 39 Downey St | Renovation / alteration | $25,000 | at north and south side walls, remove existing wood lap siding, repair framing dryrot dama... |
| Oct 30, 2026 | 1476 Pacific Av | Renovation / alteration | $20,000 | at front facade, remove existing siding and replace with new hardie artisan v-groove sidin... |
| Oct 13, 2026 | 929 Pine St | Renovation / alteration | $10,000 | ca sb-721 inspection: replace/repair rot & fungus damaged wood members. all repair work, t... |
| Aug 28, 2026 | 922 Carolina St | Renovation / alteration | $70,000 | partial interior renovation: 1st fl. kitchen remodel. relocate e. dishwasher, new wing wal... |
| Aug 25, 2026 | 439 Myra Wy | Renovation / alteration | $15,000 | at fromt facade: remove stucco, repair framing dryrot damge as necessary, install new insu... |
| Jun 26, 2026 | 62 Midcrest Wy | Renovation / alteration | $35,000 | at front facade & right hand south wall side: remove (e) stucco, siding and windows (4). r... |
| Jun 26, 2026 | 11 Newman St | Renovation / alteration | $15,000 | rear deck replacement. remove and replace deck & stairs in-kind. |
| Jun 1, 2026 | 927 Judah St | Renovation / alteration | $10,000 | dry rot repair around second floor windows and garage door. repair like for like, street v... |
| May 12, 2026 | 2072 Chestnut St | Renovation / alteration | $5,000 | revision 202505146464- adding stairs instead of ramp at rear of property , exterior work o... |
| Apr 8, 2026 | 245 Fillmore St | Renovation / alteration | $14,000 | to comply with nov 202652593, replace back egress stairs with new, like for like |
| Feb 27, 2026 | 52 Parker Av | Renovation / alteration | $6,480 | voluntarily install 5/8 retrofit anchor bolts at approximately 32' o.c. 7 inch embedment w... |
| Jan 16, 2026 | 1163 Alabama St | Renovation / alteration | $10,000 | revision to pa 202601063268: install 1/2 cdx structral plywood repair framing dry rot dama... |
| Jan 16, 2026 | 1585 10th Av | Renovation / alteration | $1 | to obtain final inspection for work approved under pa# 202411215489. all work is complete. |
| Jan 14, 2026 | 1437 Cabrillo St | Renovation / alteration | $134,794 | 1st floor: add great room with kitchenette, bedroom and bathroom |
| Jan 6, 2026 | 1163 Alabama St | Renovation / alteration | $10,000 | at backyard wall, install hardi siding overlay, approximately 450 sq ft, not visible from ... |
| Nov 17, 2025 | 260 Corbett Av | Renovation / alteration | $12,000 | at right side wall (east), remove stucco and siding as necessary to repair framing dry rot... |
39 Downey St (renovation / alteration, $25K), issued Nov 2, 2026; 1476 Pacific Av (renovation / alteration, $20K), issued Oct 30, 2026; 929 Pine St (renovation / alteration, $10K), issued Oct 13, 2026.
16 project permits in the last 12 months and 5 in the last 90 days, as published by the San Francisco Department of Building Inspection.
A free Lakewave account shows every new project permit in your territory, the general contractor on each, the trades already on its jobs, and the public bids in the same area.
Create a free accountNew construction and renovation permits in your territory, with the GC, address and estimated cost.
Each general contractor's active projects and the trades already on them.
A permit is the start of a project. Reach the GC while trades are still being lined up.
The same view for public bids, contracts ending and bid results in SLED IQ.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 16, 2026. Permits are as the city published them; estimated costs are as the applicant reported them and are not contract values. General contractors, trades and owners are named as businesses; no individuals are. Check the source before acting. See something wrong? Tell us and we will correct it.