· rebuilt nightly from public records
Hathaway Dinwiddie Co holds 61 project permits in San Francisco from the last 12 months (10 in the last 90 days, latest Nov 13, 2026), $105.6M in estimated cost.
61 project permits in San Francisco over the last 12 months, $105.6M in estimated cost, from the permits the San Francisco Department of Building Inspection publishes: each project, its address and owner, and the trades that pulled permits at the same addresses.
New construction, renovation, structural and demolition permits naming Hathaway Dinwiddie Co.
Latest issued Nov 13, 2026As the applicants reported it on these permits.
Electrical, plumbing, mechanical and other firms with permits at the same addresses.
Project permits naming Hathaway Dinwiddie Co as general contractor in the last 12 months, newest first.
| Issued | Address | Type | Est. cost | Work |
|---|---|---|---|---|
| Nov 13, 2026 | 185 Berry St | Renovation / alteration | $80,000 | 3rd floor: internal demo only, ab017 future t.i. to follow(bldg is fully sprinklered) |
| Nov 4, 2026 | 1 California St | Renovation / alteration | $3,000,000 | interior tenant improvement to renovate level 31 for office use. the project comprises an ... |
| Oct 27, 2026 | 185 Berry St | Renovation / alteration | $434,376 | suite#: 1200. mep permit pa#: 202609188353 for approved architectural. work includes new d... |
| Oct 22, 2026 | 425 Market St | Renovation / alteration | $567,100 | interior ti for a financial bank - charles schwab- mep ugprade, asscoiated with the remode... |
| Oct 9, 2026 | 1 Market St | Renovation / alteration | $512,352 | 6/fl- soft demo of (e) non structural partitions, finishes, lighting celiings, millwork, a... |
| Sep 29, 2026 | 301 Howard St | Renovation / alteration | $1,500 | rev to pa# 202608066150 new card reader, intercom, and update to the restroom layout. |
| Sep 24, 2026 | 1800 Owens St | Renovation / alteration | $1 | roof-revision 202406255203 to mount roof top equipment |
| Sep 22, 2026 | 185 Berry St | Renovation / alteration | $1 | revision to open permit#202602125816, design changes, revised evcs stall location. |
| Aug 19, 2026 | 101 California St | Renovation / alteration | $3,000 | revision to 202605010540 and 202605010517. structural drawings to reflect stair framing mo... |
| Aug 18, 2026 | 505 Howard St | Renovation / alteration | $1 | deferred health dept. submittal for bldg pa#: 202510207678. reception coffee bar 08-104, p... |
| Aug 12, 2026 | 301 Howard St | Renovation / alteration | $395,000 | suite 2200/2300 on 22/f and 23/f: tenant improvement to an (e) office space - scope includ... |
| Jul 31, 2026 | 415 Mission St | Renovation / alteration | $1 | revision to phone booths under ref#: 202505287418. floors 25. is area of work focus pod ad... |
| Jul 31, 2026 | 415 Mission St | Renovation / alteration | $1 | 8th floor: phone booth revision per pa #202509125222. |
| Jul 31, 2026 | 415 Mission St | Renovation / alteration | $1 | revision phone booths under 202505287420 floors 16. area of work fl 16, add focus pods |
| Jul 29, 2026 | 505 Howard St | Renovation / alteration | $5,800 | install evacuation maps. (level 6,7, & 8) |
| Jul 16, 2026 | 185 Berry St | Renovation / alteration | $1 | revisions from 202602266569 - permit set are clouded, tagged and include updates to restro... |
| Jul 13, 2026 | 101 California St | Renovation / alteration | $5,000 | 12th fl revision to 202512030869. revision includes updates to structural drawings to refl... |
| Jul 7, 2026 | 1 California St | Renovation / alteration | $750,000 | 22/fl- ref 202604229900- mep work |
| Jun 25, 2026 | 185 Berry St | Renovation / alteration | $2,350,400 | ti for sierra located on levels 1, 5 & 6. selective demo of portion of (e) floor slabs at ... |
| Jun 12, 2026 | 505 Howard St | Renovation / alteration | $1 | mech revisions for 8th floor ti permit # 202510207678. |
| Jun 12, 2026 | 185 Berry St | Renovation / alteration | $90,000 | provide mechanincal and electrical for pa#2025-1208-1164 |
| Jun 5, 2026 | 101 California St | Renovation / alteration | $15,000 | 12/f: revision to 202512030869. this revision includes updates to structural drawings to r... |
| Jun 5, 2026 | 101 California St | Renovation / alteration | $399,334 | 13th and 14th flr. new tenant, convenience stairs between 13th & 14th floors, work include... |
| Jun 5, 2026 | 101 California St | Renovation / alteration | $399,334 | 11 and 12/fl-(n) ti for convenience stairs between 11th and 12th floors. work include (n) ... |
| Jun 3, 2026 | 491 Post St | Renovation / alteration | $1 | to obtain final inspection for work approved under pa# 201205049824. all work is complete. |
| May 22, 2026 | 505 Howard St | Renovation / alteration | $1 | def. health dept submittal for bpa: 202510207678 - l8 catering pantry. |
| May 19, 2026 | 201 Spear St | Renovation / alteration | $20,000 | 13th fl - ti of (e) space - relocate (e) pre-fabricated phone booths and install seismic s... |
| May 15, 2026 | 101 California St | Renovation / alteration | $143,772 | 13th fl partial non-structural demo for a new horizontal exit separation on the 13th fl & ... |
| May 6, 2026 | 1 California St | Renovation / alteration | $1,500,000 | 22/fl-ref 202603318610- ti to (e) office space including non structual demo. (n) interior ... |
| May 5, 2026 | 185 Berry St | Renovation / alteration | $25,000 | suite 1200: deffered m.e.p for pa #202602125816 |
| May 5, 2026 | 185 Berry St | Renovation / alteration | $291,000 | ste 2400 deferred submittal for mep ref pa 202602135952 |
| Apr 29, 2026 | 1800 Owens St | Renovation / alteration | $1 | revision to pa# 202406255203 + 202602276646 to remove shaft bottom @ fsd |
| Apr 27, 2026 | 201 Spear St | Renovation / alteration | $200,000 | deferred mep for office ti permit 202603036821. spec suites 250 and 270. |
| Apr 16, 2026 | 101 California St | Renovation / alteration | $68,000 | revision to pa # 202512030863, 202511260514, 202512010611 - revise one storage closet into... |
| Apr 10, 2026 | 185 Berry St | Renovation / alteration | $13,820,695 | 6th fl: interior improvement for sierra in the wharfside of the building. approx 69,918 sq... |
| Apr 6, 2026 | 185 Berry St | Renovation / alteration | $12,718,000 | interior improvement for sierra. located on levels 1 and 4 at 185 berry st in the wharfsid... |
| Mar 31, 2026 | 1 California St | Renovation / alteration | $40,000 | 22/fl- demo of office space to remove paritions, breakroom area, glass office fronts, and ... |
| Mar 30, 2026 | 185 Berry St | Renovation / alteration | $125,000 | exterior improvement of entrance stair of an (e) office bldg. reconstruction of entry stai... |
| Mar 23, 2026 | 185 Berry St | Renovation / alteration | $250,000 | provide new exit passageway at ground floor |
| Mar 23, 2026 | 185 Berry St | Renovation / alteration | $13,383,368 | interior improvement for sierra, located on level 5 at 185 berry st. mep is included in th... |
| Mar 16, 2026 | 1800 Owens St | Renovation / alteration | $1 | revision 202406255203 for (n) demising wall on level 6 between secotrs 2 and 3 and remnova... |
| Mar 12, 2026 | 185 Berry St | Renovation / alteration | $250,000 | revision to pa 202503263103 additition of a restaurant bar with associated revisions to th... |
| Mar 12, 2026 | 505 Howard St | Renovation / alteration | $4,500,000 | 8th floor: .ti including - build out of new open work space, enclosed offices, meeting roo... |
| Mar 11, 2026 | 505 Howard St | Renovation / alteration | $6,083,500 | 6th flr - tenant improvement including build out of new open work space, enclosed offices,... |
| Mar 11, 2026 | 505 Howard St | Renovation / alteration | $6,025,000 | 7th flr - tenant improvement including build out of new open work space, enclosed offices,... |
| Mar 9, 2026 | 101 California St | Renovation / alteration | $9,700,000 | 12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes... |
| Mar 9, 2026 | 101 California St | Renovation / alteration | $6,500,000 | 11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. wor... |
| Mar 9, 2026 | 101 California St | Renovation / alteration | $8,800,000 | 13/f: tenant fit out of 13th floor. non structural demolition. new partitions, ceilings, d... |
| Mar 9, 2026 | 101 California St | Renovation / alteration | $6,600,000 | 14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work... |
| Mar 9, 2026 | 101 California St | Renovation / alteration | $1,000,000 | new tenant stairs on the 12th & 13th floors. work includes structural supports and new fin... |
| Mar 6, 2026 | 201 Spear St | Renovation / alteration | $796,336 | spec suites 250 & 270 -2/f: interior demolition and new construction of non-structural int... |
| Mar 4, 2026 | 535 Washington St | Renovation / alteration | $1 | revise pa #202204111970 and 202507080363 to document approved code equivalency for panic h... |
| Feb 26, 2026 | 185 Berry St | Renovation / alteration | $1,400,000 | 2/f suite 2400: tenant improvement. interior construction of non structural elements inclu... |
| Feb 19, 2026 | 185 Berry St | Renovation / alteration | $1,100,000 | 1/f suite 1200: tenant improvement. new offices interior partitions, doors, finishes, ceil... |
| Feb 6, 2026 | 185 Berry St | Renovation / alteration | $15,000 | 1/f: tenant suite demising wall. ste #150, resulting in creating suite #140 and #150. |
| Jan 29, 2026 | 185 Berry St | Renovation / alteration | $830,000 | non structural demo on floors 1,4,5, & 6 |
| Jan 14, 2026 | 1800 Owens St | Renovation / alteration | $1 | deferred submittal to pa# 202406255203 for frp structural only. |
| Jan 14, 2026 | 1140 07th St | Renovation / alteration | $1 | to obtain final inspection for work approved under 202010315479 and 202002144560 |
| Dec 18, 2025 | 201 Spear St | Renovation / alteration | $170,000 | 17/f suite 1700: mechanical - duct work re-positioning, re-alignment, installation of duct... |
| Dec 4, 2025 | 350 Mission St | Renovation / alteration | $1 | revision to bpa: 202506309783 - scope includes partial removal of approved light fixtures ... |
| Nov 17, 2025 | 505 Howard St | Renovation / alteration | $275,000 | selective interior demo of (e) parttions, finishes, mep, demo pa linked to the following b... |
Firms that pulled a permit at an address where Hathaway Dinwiddie Co holds a project permit in the last 12 months.
| Firm | Trade | Permits |
|---|---|---|
| Coast Sign LLC | Other trade | 3 |
| Ad Art Inc | Other trade | 1 |
185 Berry St (renovation / alteration, $80K), issued Nov 13, 2026; 1 California St (renovation / alteration, $3M), issued Nov 4, 2026; 185 Berry St (renovation / alteration, $434K), issued Oct 27, 2026.
61 project permits in the last 12 months and 10 in the last 90 days, as published by the San Francisco Department of Building Inspection.
Coast Sign LLC (Other trade); Ad Art Inc (Other trade).
A free Lakewave account shows every new project permit in your territory, the general contractor on each, the trades already on its jobs, and the public bids in the same area.
Create a free accountNew construction and renovation permits in your territory, with the GC, address and estimated cost.
Each general contractor's active projects and the trades already on them.
A permit is the start of a project. Reach the GC while trades are still being lined up.
The same view for public bids, contracts ending and bid results in SLED IQ.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 16, 2026. Permits are as the city published them; estimated costs are as the applicant reported them and are not contract values. General contractors, trades and owners are named as businesses; no individuals are. Check the source before acting. See something wrong? Tell us and we will correct it.