· rebuilt nightly from public records
City Building Inc holds 4 project permits in San Francisco from the last 12 months (4 in the last 90 days, latest Nov 10, 2026), $967K in estimated cost.
4 project permits in San Francisco over the last 12 months, $967K in estimated cost, from the permits the San Francisco Department of Building Inspection publishes: each project, its address and owner, and the trades that pulled permits at the same addresses.
New construction, renovation, structural and demolition permits naming City Building Inc.
Latest issued Nov 10, 2026As the applicants reported it on these permits.
Every project permit naming City Building Inc in the last year.
Project permits naming City Building Inc as general contractor in the last 12 months, newest first.
| Issued | Address | Type | Est. cost | Work |
|---|---|---|---|---|
| Nov 10, 2026 | 550 Battery St | Renovation / alteration | $97,838 | lobby/1st floor: revision to pa# 202604239962. added package, room 403 and storage room 40... |
| Sep 23, 2026 | 440 Davis Ct | Renovation / alteration | $154,000 | level 1, tenant improvment includes interior refinishes of e residential tower main lobby.... |
| Sep 23, 2026 | 550 Battery St | Renovation / alteration | $315,000 | 1/f: t.i include interior re-finishes of existing resid. tower main lobby, no change of us... |
| Sep 23, 2026 | 405 Davis Ct | Renovation / alteration | $400,000 | (leverl 1) t.i. includes interior re-finished of (e) residential tower main lobby. no chan... |
550 Battery St (renovation / alteration, $98K), issued Nov 10, 2026; 440 Davis Ct (renovation / alteration, $154K), issued Sep 23, 2026; 550 Battery St (renovation / alteration, $315K), issued Sep 23, 2026.
4 project permits in the last 12 months and 4 in the last 90 days, as published by the San Francisco Department of Building Inspection.
A free Lakewave account shows every new project permit in your territory, the general contractor on each, the trades already on its jobs, and the public bids in the same area.
Create a free accountNew construction and renovation permits in your territory, with the GC, address and estimated cost.
Each general contractor's active projects and the trades already on them.
A permit is the start of a project. Reach the GC while trades are still being lined up.
The same view for public bids, contracts ending and bid results in SLED IQ.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 16, 2026. Permits are as the city published them; estimated costs are as the applicant reported them and are not contract values. General contractors, trades and owners are named as businesses; no individuals are. Check the source before acting. See something wrong? Tell us and we will correct it.