Building permits / San Francisco / Actually Design Build Inc

· rebuilt nightly from public records

Actually Design Build Inc: building permits in San Francisco

Actually Design Build Inc holds 17 project permits in San Francisco from the last 12 months (2 in the last 90 days, latest Nov 12, 2026), $1.6M in estimated cost.

17 project permits in San Francisco over the last 12 months, $1.6M in estimated cost, from the permits the San Francisco Department of Building Inspection publishes: each project, its address and owner, and the trades that pulled permits at the same addresses.

Nov 16, 2026 · updated nightly
For trades and suppliersWhat Actually Design Build Inc is building
2last 90 days

Project permits

New construction, renovation, structural and demolition permits naming Actually Design Build Inc.

Latest issued Nov 12, 2026
$1.6M12 months

Estimated cost

As the applicants reported it on these permits.

1 new-construction permits
17permits

In the last 12 months

Every project permit naming Actually Design Build Inc in the last year.

See every Actually Design Build Inc project and who is on it →Free account. Opens on Actually Design Build Inc's permits with the trades and owners on each job.
7 of the last 12 months with a new permit
Email me Actually Design Build Inc's new permitsOne email a week. No account, no password.

Recent projects

Project permits naming Actually Design Build Inc as general contractor in the last 12 months, newest first.

IssuedAddressTypeEst. costWork
Nov 12, 20262231 29th AvRenovation / alteration$125,000remodel @ ground floor: add 2 bedrooms, bathroom and family within existing footprint. app...
Nov 6, 20262231 29th AvRenovation / alteration$85,000infill roof above lightwell and enclose tunnel entrance. provide new front door, 2 new sky...
Aug 6, 2026159 Beaver StRenovation / alteration$8,000revision to pa#202507160911: structural repairs at rear concrete retaining wall. waterproo...
Jul 23, 20261264 46th AvRenovation / alteration$4,000revision to bpa:202510207736- at rear southeast corner, step in south and west exterior wa...
Jul 21, 2026378 Franconia StRenovation / alteration$158,000remodel ground level: add new bedroom, new bathroom. new window and door at rear wall.
Jun 30, 202627 Roanoke StRenovation / alteration$70,000remodel kitchen, install new slider door at l2 rear, eliminate wall between kitchen and fa...
Jun 17, 20261262 46th AvRenovation / alteration$1revision to 202510207736. clarity deferred submittal note on title sheet. 13d sprinkler sy...
Apr 17, 20261250 42nd AvRenovation / alteration$38,888revision to pa#202506269526, t-24 revision, remodel of an existing second floor bathroom t...
Apr 16, 20261260 46th AvRenovation / alteration$1,000provide geogrouting at north and south property line for stabilization of soil pouring con...
Apr 16, 20261266 46th AvRenovation / alteration$1,000front building, provide geogrouting at north and south property line for stabilization of ...
Apr 16, 20261264 46th AvRenovation / alteration$1,000provide geogrouting at north and south property line for stabilization of soil pouring con...
Apr 6, 20261262 46th AvDemolition$30,000demolish existing type 5, 2-story 1-bedroom single family home.
Apr 6, 20261264 46th AvNew construction$953,505erect a (n) type v-b, 3-story building with 2 residential units.
Apr 6, 20261262 46th AvRenovation / alteration$1asbesetos abatement for demoltion permit under 202510207731.
Apr 6, 2026267 Divisadero StRenovation / alteration$150,000demo and rebuild laundry room and rear exterior staircase in-kind, replace 4 rear windows ...
Jan 8, 20261686 35th AvRenovation / alteration$6,900at rear, replace 4 double hung windows in kind, at front west replace 1 window aluminum cl...
Dec 2, 20251250 42nd AvRenovation / alteration$1revision to pa # 2025-0626-9526. structural framing changes based on as built conditions

Month by month

Dec 2025 1Jan 2026 1Apr 2026 8Jun 2026 2Jul 2026 2Aug 2026 1Nov 2026 2

Other active general contractors in San Francisco

Novo Construction Inc 45Gci, Inc 36Skyline Construction 35Principal Builders Inc 31Bcci Construction Company 28Redlog Flooring Services Corp 26Camp Roofing Ltd Dba Camp Construction 22The G B Group Inc 21Dabl- Rr Builders Inc 20Source Planning And Construction Inc 18Advance Construction Technology Inc 18Sc Builders, Inc 16

Common questions

What is Actually Design Build Inc building in San Francisco right now?

2231 29th Av (renovation / alteration, $125K), issued Nov 12, 2026; 2231 29th Av (renovation / alteration, $85K), issued Nov 6, 2026; 159 Beaver St (renovation / alteration, $8K), issued Aug 6, 2026.

How many building permits has Actually Design Build Inc pulled in San Francisco?

17 project permits in the last 12 months and 2 in the last 90 days, as published by the San Francisco Department of Building Inspection.

Reach the GC before the trades are pickedCreate a free account →

Related

Advance Construction Technology IncAdvanced Restoration IncAecore IncAll Best Buildrs.inc./all Trusty BldrsAll Type Remodeling IncAmbrocio Construction Inc

Reach the GC before the trades are picked

A free Lakewave account shows every new project permit in your territory, the general contractor on each, the trades already on its jobs, and the public bids in the same area.

Create a free account

Every new permit, same day

New construction and renovation permits in your territory, with the GC, address and estimated cost.

Know who builds where

Each general contractor's active projects and the trades already on them.

Get on the next job early

A permit is the start of a project. Reach the GC while trades are still being lined up.

Public work too

The same view for public bids, contracts ending and bid results in SLED IQ.

Free account · No credit card · Built from public records, refreshed nightly

Compiled from public records and refreshed nightly; last updated Nov 16, 2026. Permits are as the city published them; estimated costs are as the applicant reported them and are not contract values. General contractors, trades and owners are named as businesses; no individuals are. Check the source before acting. See something wrong? Tell us and we will correct it.