E-rate / Michigan / Troy School District

· rebuilt nightly from public records

Troy School District E-rate: who serves it, contracts ending, C2 budget left

USAC committed $1.1M to Troy School District (Michigan) over FY2024-2026 across 13 funding requests from 3 providers; $2.1M Category 2 budget is left in the FY2026-2030 cycle, 3 contracts end in the next 12 months and 0 Form 470s are open.

Selling to Troy School District? USAC committed $1.1M to it over FY2024-2026, $280K in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.

Michigan · FY2026 · updated nightly from USAC open data
For providers and resellersSelling to Troy School District
0open 470s

No 470 open today

When Troy School District posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.

$2.1MC2 budget left

Money still to spend

Category 2 budget left in the FY2026-2030 cycle (Preliminary).

Budget $2.6M
3contracts ending

Within 12 months

E-rate contracts at Troy School District that reach their end date in the next year.

Next: People Driven Technology, Inc., Sep 30, 2027
See its 470s, incumbents and budget →Free account. Opens on Troy School District with every open 470, who holds each service and the Category 2 budget left.
0 of 8 FY2026 requests had a single bidder40% discount rate: pays 60 cents on the dollarIncumbents: Fiber link Inc., People Driven Technology, Inc., Power Techniques Inc.Email me when Troy School District opens a 470
$1.1M
committed FY2024-2026
13
funding requests
3
providers
$2.1M
C2 left, FY2026-2030

Commitments by year

Funding yearCommittedFunding requestsProviders
FY2026$280,01483
FY2025$518,46911
FY2024$266,60942

Who serves Troy School District

Every provider with a funded request at Troy School District in the last three funding years: the incumbents a bid has to displace.

ProviderServicesYearsCommitted FY2024-2026
People Driven Technology, Inc.Data and internet, Internal connectionsFY2024, FY2025, FY2026$934,324
Fiber link Inc.Data and internetFY2024, FY2026$92,000
Power Techniques Inc.Internal connections, MaintenanceFY2026$38,768

Contracts ending in the next 12 months

Contract end dates as filed on the Form 471; June 30 funding-year boundaries are left out.

ProviderServiceCommittedEnds
People Driven Technology, Inc.Internal connections$93,328Sep 30, 2027
Power Techniques Inc.Internal connections$37,780Sep 30, 2027
Power Techniques Inc.Maintenance$988Sep 30, 2027

What is already installed

Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.

ManufacturerLine itemsQuantityCostModelsLatest
Cisco373,299$1,541,814CW9164I-B, PC6A-PL-03-EZ, FMD5G-LCSC-03FY2026
Fortinet474$78,468HE400-SMASMF-75F: (4) RMR400 Extension Cable, SMA (male) / SMA (female): Estimate 75-ft, SP-RACKTRAY-02: Rack mount tray for all FortiGate E series and F series models, FG-61F-BDL-950-36FY2024
People Driven12351$62,338Panduit LC Fiber Adapter Panel - Multimode (Patch Panel), Panduit Fusion Splice Pigtail Set 6-Strand LC - OM4, Panduit Fusion Splice Pigtail Set 6-Strand LC - SinglemodeFY2025
Peole Driven165$504Panduit Enclosure Adapter BlankFY2024
People Dtiven11–Athens:Remove existing optical fiber backbone: Fiber, innerduct, termination hardware. Install a 6-strand singlemode and OM4 multimode armored fiber from MDF to 11 IDFs.The fiber will be terminated with LC connectors into rackmounted fiber enclosures.FY2024
Universal10–ATS-02661FY2025

Category 2 budget

CycleBudgetLeftStatusConsultant on file
FY2026-2030$2,620,007$2,059,622PreliminaryTriple R Consultants

Common questions

Who provides E-rate services to Troy School District?

People Driven Technology, Inc. (Data and internet, Internal connections, $934K); Fiber link Inc. (Data and internet, $92K); Power Techniques Inc. (Internal connections, Maintenance, $39K).

How much E-rate Category 2 budget does Troy School District have left?

$2.1M of a $2.6M budget in the FY2026-2030 cycle (Preliminary), as of Nov 5, 2026.

Which of Troy School District's E-rate contracts end soon?

People Driven Technology, Inc., Internal connections, ends Sep 30, 2027; Power Techniques Inc., Internal connections, ends Sep 30, 2027; Power Techniques Inc., Maintenance, ends Sep 30, 2027.

What network equipment does Troy School District use?

Cisco (37 line items); Fortinet (4 line items); People Driven (12 line items); Peole Driven (1 line items); People Dtiven (1 line items), from Form 471 line items FY2024-2026.

Does Troy School District have an E-rate Form 470 open right now?

Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.

Win the next E-rate cycle

Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.

Create a free account

Catch every Form 470

See the 470s open in your territory, what each district runs today, and whether it names a brand.

Displace incumbents

See which provider serves each district, what it bought, and when the contract ends.

Find C2 money left

See how much Category 2 budget each district has left in the FY2026-2030 cycle.

Price to win

See the unit prices districts actually paid, by model, from E-rate line items.

Free account · No credit card · Built from public records, refreshed nightly

Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.