· rebuilt nightly from public records
USAC committed $3.5M to Onslow County School District (North Carolina) over FY2024-2026 across 17 funding requests from 3 providers; $3.8M Category 2 budget is left in the FY2026-2030 cycle, 0 contracts end in the next 12 months and 0 Form 470s are open.
Selling to Onslow County School District? USAC committed $3.5M to it over FY2024-2026, $1.8M in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.
When Onslow County School District posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.
Category 2 budget left in the FY2026-2030 cycle (Confirmed).
Budget $5.5ME-rate contracts at Onslow County School District that reach their end date in the next year.
| Funding year | Committed | Funding requests | Providers |
|---|---|---|---|
| FY2026 | $1,799,989 | 7 | 3 |
| FY2025 | $676,728 | 3 | 2 |
| FY2024 | $1,064,972 | 7 | 2 |
Every provider with a funded request at Onslow County School District in the last three funding years: the incumbents a bid has to displace.
| Provider | Services | Years | Committed FY2024-2026 |
|---|---|---|---|
| Applied Network Consulting Group | Internal connections | FY2024, FY2025, FY2026 | $1,835,001 |
| Conterra Ultra Broadband, LLC | Data and internet | FY2024, FY2025, FY2026 | $1,314,824 |
| DISYS Solutions, Inc. | Internal connections | FY2026 | $391,865 |
Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.
| Manufacturer | Line items | Quantity | Cost | Models | Latest |
|---|---|---|---|---|---|
| Cisco Meraki | 14 | 416 | $302,100 | LIC-ENT-5YR, LIC-MS150-48-5Y, MA-CBL-100G-50CM | FY2026 |
| Cisco | 22 | 307 | $258,334 | CW9172I-RTG, SFP-10G-SR-S=, SFP-10G-SR= | FY2026 |
| Lanmark | 12 | 2,245 | $192,840 | LANmark-6 Cat6 Plenum 4-Pair UTP, 100', Blue, LANmark-6 Cat6 Plenum 4-Pair UTP, 100' Yellow, LaNmark-6 UTP Plenum, 100', Green | FY2026 |
| Corning | 25 | 13,392 | $113,231 | Corning 12 Strand Tight Buffered Interlocking Multimode (OM3) 50 Micron Plenum Fiber, Black, Corning 12 Strand Multimode (OM3) 50 Micron Plenum Fiber, Aqua, Corning 12 Strand Tight Buffered Interlocking Multimode (OM3) 50 Micron Plenum Fiber, Aqua | FY2026 |
| Leviton | 55 | 1,571 | $102,264 | Leviton 2 Port Faceplate White, Leviton 1 Port Surface Mount Box, Leviton 3 Port Faceplate White | FY2026 |
| LANmark | 8 | 113,640 | $90,631 | LANmark-6 Cat6 Plenum 4-Pair UTP, Blue, LaNmark-6 UTP Plenum, 100', Green, LANmark-6 Cat6 Plenum 4-Pair UTP, 1000', Blue | FY2025 |
| Erico | 20 | 1,326 | $84,243 | Erico Drive on Cat 12 J-Hook, Erico 2" J-Hook, Erico Drive on Cat 12 J-Hook, 100PC | FY2026 |
| LANMark | 4 | 158 | $38,689 | LANmark-6 Cat6 Plenum 4-Pair UTP, 1000', Blue, LaNmark-6 UTP Plenum, 100', Green | FY2024 |
| CCH | 32 | 226 | $35,683 | CCH Panel, LC Adapter, Duplex, 6 Strand Multimode (OM3/4) 50 Micron, Ceramic Insert, 1Pk, Aqua, CCH Panel, SC Adapter, Duplex, 6 Strand Multimode (OM3/4) 50 Micron, Ceramic Insert, CCH 1RU, Holds Two Panels, Rack Mount Fiber Enclosure | FY2026 |
| Extreme Networks | 31 | 3,179 | $35,324 | Extreme Cat 6 UTP Channel-Rated Quickport Connector, 1Pk, Blue, Extreme Cat 6 UTP Channel-Rated Quickport Connector, 1Pk, Yellow, Extreme Cat 6 UTP Channel-Rated Quickport Connector, 1Pk, Green | FY2026 |
| Unicam | 10 | 1,260 | $29,070 | Unicam High-Performance Connector SC Multimode (OM3/OM4) 50 Micron, Ceramic Ferrule, 1Pk, Black Housing & Aqua Boot, Unicam High-Performance Connector LC Multimode (OM3/OM4) 50 Micron, Ceramic Ferrule, 1Pk, Black Housing & Aqua Boot, Unicam HP Connector SC Multimode (OM3/OM4) | FY2026 |
| LAMmark | 2 | 76 | $16,607 | LaNmark-6 UTP Plenum, 100', Green, LANmark-6 Cat6 Plenum 4-Pair UTP, 1000', Blue | FY2024 |
| Chatsworth | 28 | 84 | $16,276 | Chatsworth Wall Angle Support Kit 18", Chatsworth Standard Rack 3"D x 7'H x 19"W Grounded, Black, Chatsworth 18" Cable Runway Tube Black | FY2026 |
| Hubbell | 7 | 1,137 | $15,250 | Hubbell Raceway LANTrak per foot, Hubbell Raceway Adapter, Hubbell Raceway Box | FY2025 |
| Lowell | 7 | 32 | $7,188 | Lowell Power Panel-15A, 9-Outlets, 1U, 9ft Cord, 1-stage Surge Supp w/ 1 LED, UL Listed, Lowell Rack-Sectional Wall Mount-18U, 23inD, 1pr Adj Rails, Blk, Lowell Door-Fully Vented Front-18U, Locking, Black | FY2026 |
| Quicktron | 14 | 2,066 | $5,436 | Quiktron Cat6 Patch Cable, 1', Blue, Quiktron Cat6 Patch Cable, 1', Yellow, Quiktron Cat6 Patch Cable, 7', Blue | FY2026 |
| Quickport | 12 | 590 | $2,380 | Quickport 1-Port Surface-Mount Box, White, Quickport Single-Gang 2-Port Wallplate w/ ID Window, White, Quickport Single-Gang 4-Port Wallplate w/ ID Window, White | FY2026 |
| Zipcord | 10 | 42 | $1,648 | 2 Strand Fiber Optic Jumper, Multimode (OM3) 2.0mm Zipcord LC to LC, 3 Meter, Aqua, 2 Strand Fiber Optic Jumper, Multimode (OM3) 2.0mm Zipcord LC to LC, 1 Meter, Aqua | FY2024 |
| Twelve Panels | 3 | 3 | $1,621 | CCH 4RU, Holds Twelve Panels, Rack Mount Enclosure | FY2024 |
| STI | 3 | 14 | $902 | STI Smooth Firestop Sleeve 1", Moldable Fire Putty Sticks 1.4 x 11, STI Smooth Firestop Sleeve 2" | FY2025 |
| Performance | 2 | 25 | $551 | Unicam High-Performance Connector ST Multimode (OM1) 62.5 Micron Ceramic Ferrule, 1Pk, Amber Housing, Beige Boot | FY2024 |
| Eaton | 1 | 1 | $357 | Eaton Two-Post Network Equipment 19" Rack Width, 84" Height, Flat Black | FY2025 |
| Velcro | 6 | 35 | $287 | Velcro 3/4"x15', Velcro 5 Yard Rolls | FY2025 |
| ICC | 3 | 6 | $219 | ICC 2U Cable Manager | FY2024 |
| Cycle | Budget | Left | Status | Consultant on file |
|---|---|---|---|---|
| FY2026-2030 | $5,509,916 | $3,810,161 | Confirmed | – |
Applied Network Consulting Group (Internal connections, $1.8M); Conterra Ultra Broadband, LLC (Data and internet, $1.3M); DISYS Solutions, Inc. (Internal connections, $392K).
$3.8M of a $5.5M budget in the FY2026-2030 cycle (Confirmed), as of Nov 5, 2026.
Cisco Meraki (14 line items); Cisco (22 line items); Lanmark (12 line items); Corning (25 line items); Leviton (55 line items), from Form 471 line items FY2024-2026.
Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.
Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.
Create a free accountSee the 470s open in your territory, what each district runs today, and whether it names a brand.
See which provider serves each district, what it bought, and when the contract ends.
See how much Category 2 budget each district has left in the FY2026-2030 cycle.
See the unit prices districts actually paid, by model, from E-rate line items.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.