· rebuilt nightly from public records
USAC committed $4.2M to New Hanover County Board Of Ed (North Carolina) over FY2024-2026 across 7 funding requests from 5 providers; $3.3M Category 2 budget is left in the FY2026-2030 cycle, 0 contracts end in the next 12 months and 0 Form 470s are open.
Selling to New Hanover County Board Of Ed? USAC committed $4.2M to it over FY2024-2026, $1.8M in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.
When New Hanover County Board Of Ed posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.
Category 2 budget left in the FY2026-2030 cycle (Confirmed).
Budget $5ME-rate contracts at New Hanover County Board Of Ed that reach their end date in the next year.
| Funding year | Committed | Funding requests | Providers |
|---|---|---|---|
| FY2026 | $1,839,210 | 2 | 2 |
| FY2025 | $1,116,438 | 3 | 3 |
| FY2024 | $1,215,317 | 2 | 2 |
Every provider with a funded request at New Hanover County Board Of Ed in the last three funding years: the incumbents a bid has to displace.
| Provider | Services | Years | Committed FY2024-2026 |
|---|---|---|---|
| DISYS Solutions, Inc. | Internal connections | FY2026 | $1,425,366 |
| BellSouth Telecommunications, LLC | Data and internet | FY2024, FY2025, FY2026 | $1,243,307 |
| Applied Network Consulting Group | Internal connections | FY2024 | $804,951 |
| Presidio Networked Solutions LLC | Internal connections | FY2025 | $429,902 |
| Data Network Solutions, Inc. | Internal connections | FY2025 | $267,438 |
Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.
| Manufacturer | Line items | Quantity | Cost | Models | Latest |
|---|---|---|---|---|---|
| Cisco | 11 | 2,408 | $1,921,401 | CW9176I-RTG, CW9176I-CFG, LIC-ENT-3YR | FY2026 |
| Nutanix | 2 | 15 | $310,349 | NCI-U-32, NX-NODE-ER32 | FY2025 |
| Cisco Meraki | 5 | 1,513 | $245,968 | LIC-ENT-3YR | FY2026 |
| Corning | 22 | 48,455 | $101,220 | Corning MIC Tight-Buffered Interlocking Armored Cable, Riser 12 F, Singlemode (OS2), Corning 6 Strand Tight-Buffered Singlemode (OS2), Riser Fiber, Outdoor, Corning Altos Loose Tube, Gel-Free Cable 12 F, Singlemode (OS2) | FY2024 |
| LANmark | 3 | 195 | $77,636 | LANmark-6 Cat6 Riser 4-Pair UTP, 1000', Blue, Cat6A RDT Riser Box, Blue, LANmark-6 Cat6 OSP 4-Pair UTP, 1000', Black | FY2024 |
| Unicam | 1 | 119 | $74,513 | Unicam High-Performance Connector LC Singlemode (OS2) Ceramic Ferrule, 25Pk | FY2024 |
| CCH | 5 | 351 | $64,242 | CCH Panel, LC Adapter, Duplex, UPC, 12 Strand Singlemode (OS2), Ceramic Insert, Blue, CCH Panel, LC Adapter, Duplex, UPC, 6 Strand Singlemode (OS2), Ceramic Insert, Blue, CCH 1RU, Holds Two Panels, Rack Mount Fiber Enclosure | FY2024 |
| B-Line | 4 | 5,897 | $45,866 | B-Line 3/4" J-Hook, Beam Clamp 10Pk, J Hook 2" Flat for Wall Mount 80 4-Pair UTP 10Pk | FY2024 |
| Nextspeed | 4 | 19 | $12,480 | Nextspeed Cat 6 48-Port Patch Panel, Nextspeed Cat 6A 48-Port Patch Panel, Nextspeed Jack Panel w/ HJU6ABK 24 Port | FY2024 |
| STI | 5 | 219 | $12,349 | Moldable Fire Putty Sticks 1.4 x 11, STI Smooth Firestop Sleeve 2", STI Smooth Firestop Sleeve 1" | FY2024 |
| Quicktron | 7 | 1,362 | $9,515 | Cat6 Patch Cable, 7', Green, Cat6 Patch Cable, 5', Green, Cat6 Patch Cable, 3', Green | FY2024 |
| 2400.0 | 3 | 960 | $7,257 | 2400 Raceway Base & Cover, Dual Channel, 5' Stick, Ivory, 2400 Raceway Entrance End Fitting, Dual Channel, Ivory, 2400 Raceway Cover Clip Fitting, Dual Channel, Ivory | FY2024 |
| Coyote | 4 | 39 | $5,367 | Fiber Outdoor Splice Tray, Coyote Low Profile 24 Count Splice Tray, Coyote In-Line Runt Closure | FY2024 |
| Graybar | 1 | 25 | $5,123 | Mule Tape 1250 Lbs 3K' | FY2024 |
| Xcelerator | 2 | 64 | $4,384 | Xcelerator Cat 6 Keystone Jack, Green, Xcelerator Cat 6 Keystone Jack, 25Pk, Green | FY2024 |
| QuickClean | 1 | 27 | $3,601 | QuickClean Fiber Optic Cleaner | FY2024 |
| Ascent | 2 | 63 | $3,432 | Ascent Cat6A Jack, Green, Ascent Cat6A Jacks, 25Pk, Green | FY2024 |
| Wiremold | 1 | 80 | $2,997 | Single Gang Extra Deep Switch & Receptacle Box Fitting, Single Channel, Ivory | FY2024 |
| Greenlee | 1 | 23 | $1,812 | Poly Line Fish Tape | FY2024 |
| Hubbell | 2 | 231 | $1,091 | 2-Port Single Gang w/ID Windows, 1Pk, White, Hubbell 24-Port Unloaded Patch Panel | FY2024 |
| L.H. Dottie | 2 | 73 | $848 | Machine Screws, Zinc Plated Steel, 1/4" x 1/2", 100Pk, Machine Screws, Zinc Plated Steel, 1/4" x 1/2", 150Pk | FY2024 |
| ICC | 2 | 22 | $721 | 2U Cable Manager, 1U Cable Manager | FY2024 |
| ISB | 1 | 100 | $560 | ISB Surface Mount Box 2-Port, White | FY2024 |
| Cycle | Budget | Left | Status | Consultant on file |
|---|---|---|---|---|
| FY2026-2030 | $5,037,839 | $3,256,131 | Confirmed | – |
DISYS Solutions, Inc. (Internal connections, $1.4M); BellSouth Telecommunications, LLC (Data and internet, $1.2M); Applied Network Consulting Group (Internal connections, $805K); Presidio Networked Solutions LLC (Internal connections, $430K); Data Network Solutions, Inc. (Internal connections, $267K).
$3.3M of a $5M budget in the FY2026-2030 cycle (Confirmed), as of Nov 5, 2026.
Cisco (11 line items); Nutanix (2 line items); Cisco Meraki (5 line items); Corning (22 line items); LANmark (3 line items), from Form 471 line items FY2024-2026.
Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.
Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.
Create a free accountSee the 470s open in your territory, what each district runs today, and whether it names a brand.
See which provider serves each district, what it bought, and when the contract ends.
See how much Category 2 budget each district has left in the FY2026-2030 cycle.
See the unit prices districts actually paid, by model, from E-rate line items.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.