E-rate / Mississippi / Meridian School District

· rebuilt nightly from public records

Meridian School District E-rate: who serves it, contracts ending, C2 budget left

USAC committed $1.3M to Meridian School District (Mississippi) over FY2024-2026 across 7 funding requests from 2 providers; $389K Category 2 budget is left in the FY2026-2030 cycle, 0 contracts end in the next 12 months and 0 Form 470s are open.

Selling to Meridian School District? USAC committed $1.3M to it over FY2024-2026, $501K in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.

Mississippi · FY2026 · updated nightly from USAC open data
For providers and resellersSelling to Meridian School District
0open 470s

No 470 open today

When Meridian School District posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.

$389KC2 budget left

Money still to spend

Category 2 budget left in the FY2026-2030 cycle (Confirmed).

Budget $870K
0contracts ending

Within 12 months

E-rate contracts at Meridian School District that reach their end date in the next year.

See its 470s, incumbents and budget →Free account. Opens on Meridian School District with every open 470, who holds each service and the Category 2 budget left.
0 of 4 FY2026 requests had a single bidder90% discount rate: pays 10 cents on the dollarIncumbents: Innovative Software, Inc., Telepak Networks, Inc.Email me when Meridian School District opens a 470
$1.3M
committed FY2024-2026
7
funding requests
2
providers
$389K
C2 left, FY2026-2030

Commitments by year

Funding yearCommittedFunding requestsProviders
FY2026$500,58442
FY2025$720,96922
FY2024$82,62011

Who serves Meridian School District

Every provider with a funded request at Meridian School District in the last three funding years: the incumbents a bid has to displace.

ProviderServicesYearsCommitted FY2024-2026
Innovative Software, Inc.Internal connections, Maintenance, Managed Wi-FiFY2025, FY2026$1,047,134
Telepak Networks, Inc.Data and internetFY2024, FY2025, FY2026$257,040

What is already installed

Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.

ManufacturerLine itemsQuantityCostModelsLatest
Ruckus (CommScope)292,099$936,258CLD-BNDL-SZWA-EDU5, 901-R670-US00, CLD-PROF-APSW-REC5FY2026
Interior 6 Strand MMF OM4 I/O Fiber Run with rackmount enclosure -Turnkey66$81,485Interior Fiber Run Harris, Interior Fiber Run Northwest, Interior Fiber Run MagnoliaFY2026
600FT Average Interior 6 Strand MMF OM4 Fiber Run with rackmount enclosure -Turn211$21,500Interior Fiber RunFY2026
APC (Schneider)414$18,422SMT2200RM2UC, SMT2200CFY2026
100GbE QSFP28 to QSFP28 DirectAttached, Passive Copper Cable, 1m251$7,038E100G-QSFP-QSFP-P-0101FY2026
Cat 6 Quad Drops- Turnkey211$5,600Cat 6 Quad DropsFY2026
Cat6 Triple Drops -Turnkey211$4,180Cat6 Triple DropsFY2026
Cat 6 Double Drops- Turnkey211$2,650Cat 6 Double DropsFY2026
10GBASE-SR,SFPP MMF LCCONNECTOR (No TAA)230$1,92010G-SFPP-SR-SFY2026
1000Base-SX SFP optic, MMF, LCconnector, Optical Monitoring Capable220$1,850E1MG-SX-OMFY2026
25Ge Sfp28 Dac, Passive, 1M240$1,720E25G-SFP28-TWX-P-0101FY2026
25Ge Sfp28 Dac, Passive, 0.5M241$1,681E25G-SFP28-TWX-P-00501FY2026
Cat 6 Single Drops- Turnkey210$1,500Cat 6 Single DropsFY2026
Cat 6 AP drops -Turnkey211$1,300Cat 6 Single AP dropsFY2026
SmartRack 42U Black Enclosure21$1,258SR42UBFY2026
1000Base-LX SFP optic, SMF, LCconnector, Optical Monitoring Capable26$1,167E1MG-LX-OMFY2026
SmartRack 18U Wall Mount Enclosure21$964SRW26USFY2026
E4DR19FM45U Open 4 Post Rack21$719Floor Mount Open RackFY2026
100GbE QSFP28 to QSFP28 DirectAttached, Passive Copper Cable 3m24$676E100G-QSFP-QSFP-P-0301FY2026
10GBASE-LR,SFPP SMF LCCONNECTOR (No TAA)26$46210G-SFPP-LR-SFY2026
E19SWM25U24 Swing Out Rack21$366Wall Mount Open RackFY2026
E25G-Sfp28-Twx-P-0301 25Ge Sfp28 Dac, Passive,3M26$348E25G-SFP28-TWX-P-0301FY2026
10GbE Direct Attach SFP+ to SFP+Passive copper cable, 5 m26$31810G-SFPP-TWX-P-0501FY2026
SmartRackRoof Mount Fan21$279SRFANROOFFY2026
10GbE Direct Attach SFP+ to SFP+Passive copper cable, 3 m26$25210G-SFPP-TWX-P-0301FY2026

Category 2 budget

CycleBudgetLeftStatusConsultant on file
FY2026-2030$870,178$389,255ConfirmedRollins & Sumrall Education Group, Inc

Common questions

Who provides E-rate services to Meridian School District?

Innovative Software, Inc. (Internal connections, Maintenance, Managed Wi-Fi, $1M); Telepak Networks, Inc. (Data and internet, $257K).

How much E-rate Category 2 budget does Meridian School District have left?

$389K of a $870K budget in the FY2026-2030 cycle (Confirmed), as of Nov 5, 2026.

What network equipment does Meridian School District use?

Ruckus (CommScope) (29 line items); Interior 6 Strand MMF OM4 I/O Fiber Run with rackmount enclosure -Turnkey (6 line items); 600FT Average Interior 6 Strand MMF OM4 Fiber Run with rackmount enclosure -Turn (2 line items); APC (Schneider) (4 line items); 100GbE QSFP28 to QSFP28 DirectAttached, Passive Copper Cable, 1m (2 line items), from Form 471 line items FY2024-2026.

Does Meridian School District have an E-rate Form 470 open right now?

Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.

Win the next E-rate cycle

Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.

Create a free account

Catch every Form 470

See the 470s open in your territory, what each district runs today, and whether it names a brand.

Displace incumbents

See which provider serves each district, what it bought, and when the contract ends.

Find C2 money left

See how much Category 2 budget each district has left in the FY2026-2030 cycle.

Price to win

See the unit prices districts actually paid, by model, from E-rate line items.

Free account · No credit card · Built from public records, refreshed nightly

Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.