· rebuilt nightly from public records
USAC committed $1.2M to Great Hearts America-Texas (Texas) over FY2024-2026 across 19 funding requests from 3 providers; $2.7M Category 2 budget is left in the FY2026-2030 cycle, 0 contracts end in the next 12 months and 0 Form 470s are open.
Selling to Great Hearts America-Texas? USAC committed $1.2M to it over FY2024-2026, $251K in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.
When Great Hearts America-Texas posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.
Category 2 budget left in the FY2026-2030 cycle (Confirmed).
Budget $3.1ME-rate contracts at Great Hearts America-Texas that reach their end date in the next year.
| Funding year | Committed | Funding requests | Providers |
|---|---|---|---|
| FY2026 | $251,333 | 8 | 3 |
| FY2025 | $518,760 | 5 | 2 |
| FY2024 | $448,760 | 6 | 2 |
Every provider with a funded request at Great Hearts America-Texas in the last three funding years: the incumbents a bid has to displace.
| Provider | Services | Years | Committed FY2024-2026 |
|---|---|---|---|
| Insight Public Sector Inc. | Internal connections, Maintenance | FY2024, FY2025, FY2026 | $947,506 |
| Charter Communications Operating, LLC | Data and internet | FY2024, FY2025, FY2026 | $218,065 |
| Artcom Associates, Inc. | Internal connections | FY2026 | $53,282 |
Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.
| Manufacturer | Line items | Quantity | Cost | Models | Latest |
|---|---|---|---|---|---|
| HPE Aruba | 135 | 2,806 | $1,389,215 | Aruba AP-635 (R7J28A), Aruba Central AP Foundation 5y Sub E-STU, Q9Y60AAE, Aruba Central AP Foundation 5y Sub E-STU (Q9Y60AAE) | FY2026 |
| CommScope | 68 | 2,774 | $277,932 | 300ft Panduit Cat 6 Cable Drop, 6P4P24-BL-P-CMS-AP, Up to 300ft Panduit Cat 6 Cable Drop or equivalent #CS37P, Cat 6 10 ft blue patch cord cables, #UNC6-BL-1M | FY2026 |
| Cabling - Ethernet | 2 | 337 | $132,068 | Up to 300ft Panduit Cat 6 Cable Drop, 6AP4P24, Up to 300ft Panduit Cat 6a Cable Drop for Access Points, 6AP4P24 | FY2025 |
| Panduit | 9 | 209 | $78,492 | Up to 300ft Panduit Cat 6 Cable Drop, #6P4P24-BL-P-CMS-AP, Up to 300ft Panduit Cat 6a Cable Drop for Access Points, #6AP4P24-BL-P-CMS-AP, Vertical Cable Manger, WMPV45E | FY2026 |
| APC (Schneider) | 14 | 15 | $27,957 | SMX2000LVNC, SMX2000LVNC 2000VA Rack UPS, APC SMX2000LVNC, #2000VA Rack UPS | FY2026 |
| Cabling- Patch Cable | 8 | 674 | $7,588 | Cat 6 10 ft blue patch cord cables, UC1BBB20ZF010, Cat 6 1 ft blue patch cord cables, UC1BBB2-0zf001, Cat 6 10 ft yellow patch cord cables, UNC6-YL-10F | FY2025 |
| Chatsworth | 7 | 11 | $6,014 | Panduit WMPV45E, #35511-703, Panduit CMR19x84, #55053-703, Middle Atlantic CLB-6 with CLH-WRS-W6-W12, 10250-712 | FY2025 |
| Corning | 1 | 1 | $2,939 | 500ft 50/125 Fiber Run (6-strand Multi-Mode including terminations), #M-5-IPJ-6DN-LX-AQ | FY2024 |
| Monoprice | 4 | 15 | $2,521 | 48-port Patch Panel 7305, 760207282, 24-port Patch Panel 7253, 760207274, Monoprice 7305, #CPP-UDDM-M-2U-48 | FY2025 |
| Cabling - Fiber | 1 | 1 | $2,500 | 500ft 50/125 Fiber Run (6-strand Multi-Mode including terminations), 760128181 | FY2025 |
| Fibertronics | 2 | 2 | $1,093 | Fiber Patch Panel LGX-APP11-2D-1U, 760249998, Fibertronics LGX-APP11-2D-1U, #EPX-1U-MOD-ENC | FY2025 |
| Middle Atlantic | 1 | 4 | $1,017 | Ladder Rack CLB-6 with CLH-WRS-W6-W12, 10250-712 | FY2025 |
| Cabling- White biscuit blocks | 1 | 150 | $693 | Cat 6 RJ-45 white biscuit block, 760248521 | FY2025 |
| Cycle | Budget | Left | Status | Consultant on file |
|---|---|---|---|---|
| FY2026-2030 | $3,061,848 | $2,711,231 | Confirmed | E-Rate Consulting Specialists Inc |
Insight Public Sector Inc. (Internal connections, Maintenance, $948K); Charter Communications Operating, LLC (Data and internet, $218K); Artcom Associates, Inc. (Internal connections, $53K).
$2.7M of a $3.1M budget in the FY2026-2030 cycle (Confirmed), as of Nov 5, 2026.
HPE Aruba (135 line items); CommScope (68 line items); Cabling - Ethernet (2 line items); Panduit (9 line items); APC (Schneider) (14 line items), from Form 471 line items FY2024-2026.
Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.
Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.
Create a free accountSee the 470s open in your territory, what each district runs today, and whether it names a brand.
See which provider serves each district, what it bought, and when the contract ends.
See how much Category 2 budget each district has left in the FY2026-2030 cycle.
See the unit prices districts actually paid, by model, from E-rate line items.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.