E-rate / Utah / Granite School District

· rebuilt nightly from public records

Granite School District E-rate: who serves it, contracts ending, C2 budget left

USAC committed $3.2M to Granite School District (Utah) over FY2024-2026 across 9 funding requests from 5 providers; $10.1M Category 2 budget is left in the FY2026-2030 cycle, 0 contracts end in the next 12 months and 0 Form 470s are open.

Selling to Granite School District? USAC committed $3.2M to it over FY2024-2026, $720K in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.

Utah · FY2026 · updated nightly from USAC open data
For providers and resellersSelling to Granite School District
0open 470s

No 470 open today

When Granite School District posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.

$10.1MC2 budget left

Money still to spend

Category 2 budget left in the FY2026-2030 cycle (Confirmed).

Budget $11.3M
0contracts ending

Within 12 months

E-rate contracts at Granite School District that reach their end date in the next year.

See its 470s, incumbents and budget →Free account. Opens on Granite School District with every open 470, who holds each service and the Category 2 budget left.
0 of 3 FY2026 requests had a single bidder60% discount rate: pays 40 cents on the dollarIncumbents: Amplify Systems Integration, FILLMORE FLATS, Inc. DBA COLEMAN'S TELECOM, Valcom Salt Lake City, LCEmail me when Granite School District opens a 470
$3.2M
committed FY2024-2026
9
funding requests
5
providers
$10.1M
C2 left, FY2026-2030

Commitments by year

Funding yearCommittedFunding requestsProviders
FY2026$720,43833
FY2025$813,57633
FY2024$1,661,10833

Who serves Granite School District

Every provider with a funded request at Granite School District in the last three funding years: the incumbents a bid has to displace.

ProviderServicesYearsCommitted FY2024-2026
Valcom Salt Lake City, LCInternal connectionsFY2024, FY2025, FY2026$1,255,607
ConvergeOne, Inc.Internal connectionsFY2024$833,728
Amplify Systems IntegrationInternal connectionsFY2025, FY2026$786,699
FILLMORE FLATS, Inc. DBA COLEMAN'S TELECOMInternal connectionsFY2025, FY2026$239,488
Cache Valley ElectricInternal connectionsFY2024$79,600

What is already installed

Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.

ManufacturerLine itemsQuantityCostModelsLatest
Cisco916,965$2,122,980E3N-AIRWLAN-E, AIR-DNA-A-1Y, Cisco Catalyst 9130AX - C9130AXI-BFY2026
HPE Aruba351,056$1,636,188HPE Aruba 1/2.5/5/10GBase- T (PoE+) x 8 Module. Part J9995A, HPE Aruba CX 5420 Power Supply Part S0U53A ABA, HPE Aruba CX 5420 24p 10M/100M/1G Module Part S0u61AFY2026
AFL571,300$128,950AFL KQ012C611801BIF-AIAP - Multi Mode Fiber (Outdoor Rated), Part KQ0129611801-AIAP - Fiber -Single Mode Indoor rated armored 12-F, Part AFL KQ012C611801BIF-AIAP - Multi Mode Outdoor UV rated Armored Plenum 12-F ANSI/TIA-568.3-DFY2026
ICC3450,010$113,864ICCABT6VBL - CAT 6 PLENUM BLUE, ICCABT6VBL -Cat 6 Cable, ICRESDC28K - Network Wire CabinetFY2026
CommScope2410,000$102,500-Cat 6 Cable, CAT6 Plenum blue. Part 6504FY2026
APC (Schneider)662$66,421APC Smart Floor UPS - SMT2200C, APC Smart-UPS Part SMT2200C UPS (Tower) - AC 110/120/127 V - 1.98 kW - 2200 VA - RS-232, USB - output connectors: 10 - Canada, United States - black - with APC SmartConnect, APC Smart-UPS Part SMT2200RM2UC UPS (rackmountable) - AC 110/120/127 V - 1.98 kW - 2200 VA - RS-232, USB - output connectors: 8 - 2U - Canada, United States - black - with APC SmartConnectFY2026
Great Lakes28$32,068GL840E-2932-B-SQM6MSFY2026
Corning221,300$23,004Part 012T88-33190-29. Multi Mode Fiber Cabling (indoor rated)FY2026
Berk-Tek15,000$10,500Multimode 12F MO4 indoor outdoor black UV rated, ABSI/TIA-568.3-D, Berk-Tek (in feet)FY2024
Cp Technologies2100$4,305LCXX4012D003MS9, LCXXS012D003MS9FY2026

Category 2 budget

CycleBudgetLeftStatusConsultant on file
FY2026-2030$11,309,891$10,109,162ConfirmedUETN NFP E-Rate Consulting Services

Common questions

Who provides E-rate services to Granite School District?

Valcom Salt Lake City, LC (Internal connections, $1.3M); ConvergeOne, Inc. (Internal connections, $834K); Amplify Systems Integration (Internal connections, $787K); FILLMORE FLATS, Inc. DBA COLEMAN'S TELECOM (Internal connections, $239K); Cache Valley Electric (Internal connections, $80K).

How much E-rate Category 2 budget does Granite School District have left?

$10.1M of a $11.3M budget in the FY2026-2030 cycle (Confirmed), as of Nov 5, 2026.

What network equipment does Granite School District use?

Cisco (9 line items); HPE Aruba (35 line items); AFL (5 line items); ICC (3 line items); CommScope (2 line items), from Form 471 line items FY2024-2026.

Does Granite School District have an E-rate Form 470 open right now?

Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.

Win the next E-rate cycle

Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.

Create a free account

Catch every Form 470

See the 470s open in your territory, what each district runs today, and whether it names a brand.

Displace incumbents

See which provider serves each district, what it bought, and when the contract ends.

Find C2 money left

See how much Category 2 budget each district has left in the FY2026-2030 cycle.

Price to win

See the unit prices districts actually paid, by model, from E-rate line items.

Free account · No credit card · Built from public records, refreshed nightly

Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.