· rebuilt nightly from public records
USAC committed $1M to Duplin County School District (North Carolina) over FY2024-2026 across 6 funding requests from 3 providers; $2M Category 2 budget is left in the FY2026-2030 cycle, 0 contracts end in the next 12 months and 0 Form 470s are open.
Selling to Duplin County School District? USAC committed $1M to it over FY2024-2026, $147K in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.
When Duplin County School District posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.
Category 2 budget left in the FY2026-2030 cycle (Forecast).
Budget $2ME-rate contracts at Duplin County School District that reach their end date in the next year.
| Funding year | Committed | Funding requests | Providers |
|---|---|---|---|
| FY2026 | $146,675 | 1 | 1 |
| FY2025 | $706,567 | 4 | 2 |
| FY2024 | $156,006 | 1 | 1 |
Every provider with a funded request at Duplin County School District in the last three funding years: the incumbents a bid has to displace.
| Provider | Services | Years | Committed FY2024-2026 |
|---|---|---|---|
| Applied Network Consulting Group | Internal connections, Managed Wi-Fi | FY2025 | $550,561 |
| CenturyLink Carolina Telephone and Telegraph Co. FKA Embarq | Data and internet | FY2024, FY2025 | $312,012 |
| Brightspeed of Eastern North Carolina, LLC | Data and internet | FY2026 | $146,675 |
Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.
| Manufacturer | Line items | Quantity | Cost | Models | Latest |
|---|---|---|---|---|---|
| Cambium | 5 | 474 | $251,272 | Wi-Fi 6/6E Indoor Tri-radio AP with SDR 4x4. 5GbE, AC Line Cord, US Type B, 1.2m, C13 Connector, cnMatrix EX2052-P, Intelligent Ethernet PoE Switch, 48 1G and 4 SFP+ Fixed 540 - no pwr cord, USA Only | FY2025 |
| APC (Schneider) | 2 | 122 | $73,119 | APC Smart-UPS 1500VA LCD RM 2U 120V with SmartConnect, APC Smart-UPS 1500VA, Tower, LCD 120V with SmartConnect Port | FY2025 |
| RDT | 12 | 213 | $43,178 | Cat6A RDT Riser Box, Blue, 100', Cat6A RDT Riser Box, Blue, 1,000' | FY2025 |
| Leviton | 12 | 612 | $14,284 | Leviton Cat 6A Atlas-X1 Jack Yellow | FY2025 |
| Quickport | 24 | 191 | $4,935 | Quickport 2-Port Surface-Mount Box, White, 1RU 24-Port Flat Quickport Patch Panel, Magnifying Lens Label Holder, Empty | FY2025 |
| Ortronics | 24 | 612 | $3,203 | Ortronics Cat 6A Patch Cable, 5', Yellow, Ortronics Cat 6A Patch Cable, 3', Yellow | FY2025 |
| Ventev | 1 | 8 | $2,545 | Ventev Wi-Fi Right Angle Wall Mount with Clear Access Point Cover | FY2025 |
| B-Line | 12 | 620 | $1,389 | B-Line J Hook 3/4" Flat | FY2025 |
| Lowell | 3 | 3 | $1,357 | Lowell Rack-Swing Gate-12U, 18" Deep, 1pr Fixed Rails, Black | FY2025 |
| Cycle | Budget | Left | Status | Consultant on file |
|---|---|---|---|---|
| FY2026-2030 | $1,974,983 | $1,974,983 | Forecast | – |
Applied Network Consulting Group (Internal connections, Managed Wi-Fi, $551K); CenturyLink Carolina Telephone and Telegraph Co. FKA Embarq (Data and internet, $312K); Brightspeed of Eastern North Carolina, LLC (Data and internet, $147K).
$2M of a $2M budget in the FY2026-2030 cycle (Forecast), as of Nov 5, 2026.
Cambium (5 line items); APC (Schneider) (2 line items); RDT (12 line items); Leviton (12 line items); Quickport (24 line items), from Form 471 line items FY2024-2026.
Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.
Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.
Create a free accountSee the 470s open in your territory, what each district runs today, and whether it names a brand.
See which provider serves each district, what it bought, and when the contract ends.
See how much Category 2 budget each district has left in the FY2026-2030 cycle.
See the unit prices districts actually paid, by model, from E-rate line items.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.