· rebuilt nightly from public records
USAC committed $2.8M to Cadillac Area Public Schools (Michigan) over FY2024-2026 across 17 funding requests from 6 providers; $159K Category 2 budget is left in the FY2026-2030 cycle, 0 contracts end in the next 12 months and 0 Form 470s are open.
Selling to Cadillac Area Public Schools? USAC committed $2.8M to it over FY2024-2026, $333K in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.
When Cadillac Area Public Schools posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.
Category 2 budget left in the FY2026-2030 cycle (Confirmed).
Budget $491KE-rate contracts at Cadillac Area Public Schools that reach their end date in the next year.
| Funding year | Committed | Funding requests | Providers |
|---|---|---|---|
| FY2026 | $333,378 | 4 | 3 |
| FY2025 | $138,814 | 5 | 2 |
| FY2024 | $2,347,312 | 8 | 5 |
Every provider with a funded request at Cadillac Area Public Schools in the last three funding years: the incumbents a bid has to displace.
| Provider | Services | Years | Committed FY2024-2026 |
|---|---|---|---|
| Fiber Optic Management, LLC | Data and internet | FY2024, FY2026 | $2,243,664 |
| Sentinel Technologies, Inc. | Data and internet, Internal connections, Maintenance | FY2024, FY2025, FY2026 | $326,261 |
| Charter Communications Operating, LLC | Data and internet | FY2024, FY2025 | $140,951 |
| Kendra IT Consulting | Internal connections | FY2024 | $62,506 |
| Division 27, LLC | Internal connections | FY2026 | $33,117 |
| JEM Computers, Inc. | Internal connections | FY2024 | $13,004 |
Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.
| Manufacturer | Line items | Quantity | Cost | Models | Latest |
|---|---|---|---|---|---|
| Cisco | 15 | 500 | $283,946 | CW9174I-RTG, LIC-CW-E wireless license, SKU: C9200LSTACK- KIT= | FY2026 |
| Belden | 17 | 33,170 | $25,880 | 2413 D151000 CAT6 (Blue) 2413 D151000, 2413 D151000: CAT6 (Blue) 2413 D151000, 10GXW13 CAT6A Slim, Green 10GXW13 0051000 | FY2026 |
| Fortinet | 3 | 4 | $18,469 | FN-TRAN-SFP+SR transceiver module, FG-401F-BDL-950-60, FG-401F Network Security/Firewall Appliance - 16 Port - 10 Gigabit Ethernet - 80 Gbit/s Firewall Throughput - 16 x RJ-45 - 16.0 Total Expansion Slots - 5 Year FortiCare Premium and FortiGuard Unified Threat Protection (UTP): SKU FG-401F-BDL-950-60 | FY2026 |
| CyberPower | 4 | 16 | $12,776 | BP48VP2U02 Extended Battery Module, PRI1500RTXL2UN Sinewave UPS Systems, PR2200RTXL2UAN Sinewave UPS Systems | FY2024 |
| Sentinel | 2 | 3 | $10,602 | N820-05M: 10Gb fiber patch cord, 5 meter, Professional Services - Fixed Price | FY2026 |
| Superior Essex | 2 | 14,000 | $7,260 | SUPES-250606052 Cat 6, 25027760 Cat 6 | FY2026 |
| Ortronics | 4 | 274 | $6,858 | OR-RDC61010-06 Slim CAT6 Patch Cable (Blue) 10 ft NO BOOTS, OR-RDC61001-06 Slim CAT6 Patch Cable (Blue) 1ft NO BOOTS, OR-RDC61010-05 Slim CAT6A Patch Cable (Green) 10 ft NO BOOTS | FY2024 |
| Chatsworth | 2 | 7 | $6,431 | Adjustable QuadraRack, 12-24 Mounting Holes, 575mm - 725mm Deep, 45 RMU. 7 foot High, Black, Part 15216-703 Adjustable QuadraRack | FY2025 |
| Equal Optics | 8 | 50 | $6,092 | Equal Optics LC-LC Duplex SM 9/125 (OS2) Yellow - 1M; SKU EO-LCLCSDY- 1M, Equal Optics 10GBase-LR SFP+ Transceiver (SMF, 16 149.00 2,384.00 1310nm, 10km, LC, DOM) Cisco Compatible; SKU SFP-10G-LR-SEO, LC-LC Duplex SM 9/125 2M | FY2026 |
| Cooper | 1 | 560 | $3,214 | Bridle Ring | FY2024 |
| Granger | 1 | 560 | $2,016 | Beam Clamp | FY2024 |
| Wiremold | 10 | 212 | $1,963 | V2000B&C RACEWAY BASE&CV R, 88299213 10ft metal raceway, HUBD NS614W PLATE DECOR KEYSTONE FRAME 4P WHITE | FY2026 |
| Fisal | 7 | 116 | $1,138 | 2" Underground HDPE Conduit (orange), X9LULUS3FISCU 3-meter LC to LC SM patch Cables, F1BLANKUBK FIS BLANK PLATE WITH NO HOLES UNLOADED - BLACK | FY2024 |
| Berk-Tek | 2 | 870 | $995 | BERK-25316989, BERK-25696140 | FY2024 |
| FISAL | 2 | 8 | $712 | F1RMSO1RU2X Fiber Panel (1U), F1SPL24 24 POSITION ALUMINUM SPLICE TRAY | FY2024 |
| Raco | 3 | 42 | $533 | 8660 1-Gang Metal Electrical Box, 2" Rigid 10', 2 in. E-Series Fitting Rigid/IMC LB Conduit Body | FY2024 |
| Navepoint | 1 | 2 | $387 | Cable Tray (AMEX MDF) | FY2024 |
| Rapink | 4 | 74 | $194 | BOB2Z8S3JW: 1 ft Cat 6A patch cable, BOB2Z8S3JW: 10 ft Cat 6A patch cable, BODWV85N6V: 10 ft Cat 6A patch cable | FY2026 |
| Hubbell | 1 | 30 | $89 | WALLPLATE 1-GGFCI SS | FY2024 |
| Duraline | 1 | 3 | $72 | " Rigid 10' 20 $19.92 $398.40 200005097 DURALINE HDPE-DURA 2" Underground Couplers | FY2024 |
| Kendra | 1 | 1 | $72 | Wipes, Alcohol, Swabs, One Click | FY2024 |
| Cable Matters | 1 | 10 | $26 | BOBMW6YRH8 MOUNT BOX | FY2026 |
| AFL | 1 | 36 | $6 | Fusion Splice Sleeves | FY2024 |
| Cycle | Budget | Left | Status | Consultant on file |
|---|---|---|---|---|
| FY2026-2030 | $491,025 | $159,226 | Confirmed | Convergent Technology Partners |
Fiber Optic Management, LLC (Data and internet, $2.2M); Sentinel Technologies, Inc. (Data and internet, Internal connections, Maintenance, $326K); Charter Communications Operating, LLC (Data and internet, $141K); Kendra IT Consulting (Internal connections, $63K); Division 27, LLC (Internal connections, $33K).
$159K of a $491K budget in the FY2026-2030 cycle (Confirmed), as of Nov 5, 2026.
Cisco (15 line items); Belden (17 line items); Fortinet (3 line items); CyberPower (4 line items); Sentinel (2 line items), from Form 471 line items FY2024-2026.
Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.
Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.
Create a free accountSee the 470s open in your territory, what each district runs today, and whether it names a brand.
See which provider serves each district, what it bought, and when the contract ends.
See how much Category 2 budget each district has left in the FY2026-2030 cycle.
See the unit prices districts actually paid, by model, from E-rate line items.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.