E-rate / California / Bright Star Schools

· rebuilt nightly from public records

Bright Star Schools E-rate: who serves it, contracts ending, C2 budget left

USAC committed $2M to Bright Star Schools (California) over FY2024-2026 across 7 funding requests from 2 providers; $322K Category 2 budget is left in the FY2026-2030 cycle, 0 contracts end in the next 12 months and 0 Form 470s are open.

Selling to Bright Star Schools? USAC committed $2M to it over FY2024-2026, $754K in FY2026. Here is who holds its services today, which contracts end soon, what equipment is already installed, and how much Category 2 budget it still has to spend.

California · FY2026 · updated nightly from USAC open data
For providers and resellersSelling to Bright Star Schools
0open 470s

No 470 open today

When Bright Star Schools posts a Form 470 it takes bids for 28 days. The alert below tells you the day it does.

$322KC2 budget left

Money still to spend

Category 2 budget left in the FY2026-2030 cycle (Confirmed).

Budget $730K
0contracts ending

Within 12 months

E-rate contracts at Bright Star Schools that reach their end date in the next year.

See its 470s, incumbents and budget →Free account. Opens on Bright Star Schools with every open 470, who holds each service and the Category 2 budget left.
2 of 2 FY2026 requests had a single bidder90% discount rate: pays 10 cents on the dollarIncumbents: Nationwide Network Professionals, U.S. TelePacific Corp.Email me when Bright Star Schools opens a 470
$2M
committed FY2024-2026
7
funding requests
2
providers
$322K
C2 left, FY2026-2030

Commitments by year

Funding yearCommittedFunding requestsProviders
FY2026$754,28722
FY2025$496,63932
FY2024$712,69722

Who serves Bright Star Schools

Every provider with a funded request at Bright Star Schools in the last three funding years: the incumbents a bid has to displace.

ProviderServicesYearsCommitted FY2024-2026
U.S. TelePacific Corp.Data and internetFY2024, FY2025, FY2026$1,364,474
Nationwide Network ProfessionalsInternal connectionsFY2024, FY2025, FY2026$599,150

What is already installed

Category 2 line items FY2024-2026: the installed base a competing bid has to fit, or replace.

ManufacturerLine itemsQuantityCostModelsLatest
Tripp Lite (Eaton)346$32,480Tripplite Double Side Vertical Cable Manager, Tripplite Horizontal Cable Manager 1U/2U, Tripplite Standing Rack equal to SR42UBDPWDFY2026
APC (Schneider)215$30,288SMTL1500RM3UC, APC Smart UPS 1500VA 240WhFY2026
Cabinets and Racks Wide and Deep 42U Enclosures APC NetShelter SX 600 1200110$28,400Cabinets and Racks Wide and Deep 42U Enclosures APC NetShelter SX 600 1200FY2026
APC UPS 3000VA Smart-UPS Sine Wave19$23,850SMX3000LVNCFY2026
Cat 5 or 6175$20,250Cat 5 or 6FY2025
J-hooks in order to hang cabling11,000$7,990J-hooks in order to hang cablingFY2026
10 Ft Cat 6A Patch Cable for active Jack1700$6,65010 Ft Cat 6A Patch Cable for active JackFY2026
Cat 6A molded 5ft patch cable for active port1700$3,500Cat 6A molded 5ft patch cable for active portFY2026
Ladder bracket rack for runway, wall bracket and terminations110$2,988Ladder bracket rack for runway, wall bracket and terminationsFY2026
Data inserts for terminating data cabling1735$2,940Data inserts for terminating data cablingFY2026
Tiger boxes to install faceplates in walls to LV1 or LV21420$2,835Tiger boxes to install faceplates in walls to LV1 or LV2FY2026
48 Port Patch Panel Black 2U116$2,38448 Port Patch Panel Black 2UFY2026
Patch cords175$1,571Patch cordsFY2025
two port data faceplates1700$1,113two port data faceplatesFY2026
The Bonding and Grounding Kit grounds a cabinet from its' door to its' body. It 110$950The Bonding and Grounding Kit grounds a cabinet from its' door to its' body. It provides all cable and hardware necessary to ground across the door gap.FY2026
patch panel12$832patch panelFY2025
Basic multiple outlet PDU 20A120–Basic multiple outlet PDU 20AFY2026

Category 2 budget

CycleBudgetLeftStatusConsultant on file
FY2026-2030$730,288$321,523ConfirmedGETFUNDED

Common questions

Who provides E-rate services to Bright Star Schools?

U.S. TelePacific Corp. (Data and internet, $1.4M); Nationwide Network Professionals (Internal connections, $599K).

How much E-rate Category 2 budget does Bright Star Schools have left?

$322K of a $730K budget in the FY2026-2030 cycle (Confirmed), as of Nov 5, 2026.

What network equipment does Bright Star Schools use?

Tripp Lite (Eaton) (3 line items); APC (Schneider) (2 line items); Cabinets and Racks Wide and Deep 42U Enclosures APC NetShelter SX 600 1200 (1 line items); APC UPS 3000VA Smart-UPS Sine Wave (1 line items); Cat 5 or 6 (1 line items), from Form 471 line items FY2024-2026.

Does Bright Star Schools have an E-rate Form 470 open right now?

Not as of Nov 5, 2026. Form 470s post most weeks in the fall and winter and take bids for 28 days.

Win the next E-rate cycle

Lakewave's E-rate Sweep shows every open Form 470 in your territory, the incumbent at each district, its Category 2 budget left and what it runs today.

Create a free account

Catch every Form 470

See the 470s open in your territory, what each district runs today, and whether it names a brand.

Displace incumbents

See which provider serves each district, what it bought, and when the contract ends.

Find C2 money left

See how much Category 2 budget each district has left in the FY2026-2030 cycle.

Price to win

See the unit prices districts actually paid, by model, from E-rate line items.

Free account · No credit card · Built from public records, refreshed nightly

Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Figures are as USAC publishes them; committed amounts are funding commitments, not payments. Contract end dates on June 30 are left out because many applicants enter the funding-year end instead. Check the source before acting. See something wrong? Tell us and we will correct it.