· rebuilt nightly from public records
Wrangler Construction has 3 public construction bids on record since 2026 and was low bidder on 0 (0%); the typical gap to the low bid was 31.8%.
Wrangler Construction bids on public construction work in Florida since 2026, from the bid tabulations agencies publish: each job, what Wrangler Construction bid, the low bid and who placed it.
Bid tabulations naming Wrangler Construction since 2026, jobs of $100,000 or more.
Times Wrangler Construction was the apparent low bidder.
Typical gap to the low bid: 31.8%Open bids in Florida for the kind of work Wrangler Construction has bid on, with a week or more left.
From the agency's published bid tabulation. Apparent low bidder is not always the award.
| Agency | Job | Decided | Wrangler Construction bid | Low bidder | Low bid | Gap |
|---|---|---|---|---|---|---|
| City of Dania Beach | Sidewalk Rehabilitation Phase II | Oct 27, 2026 | $626,935 | Homestead Concrete & Drainage | $475,705 | +31.8% |
| City of Dania Beach | Chester Byrd Park Improvements | Oct 9, 2026 | $1,585,124 | M&J Consulting Group Corp | $1,428,398 | +11.0% |
| Alachua County, Florida | Sidewalk Construction on SW 6th Place from SW 70th Terrace to SW 67th Terrace | Sep 16, 2026 | $169,474 | PSG Concrete & Excavation, LLC | $117,819 | +43.8% |
Open bids in Florida whose title shares the kind of work Wrangler Construction has bid on. Each links to the agency's board.
| Bid | Agency | State | Due |
|---|---|---|---|
| 2027 Sidewalk Repair and Replacement | City of Ormond Beach | Florida | Nov 18, 2026 13 days |
| Winfield Blvd Pedestrian Sidewalk and Bridge | City of Margate | Florida | Nov 19, 2026 14 days |
| Rudy Hubbard Way Sidewalk Improvements | City of Tallahassee | Florida | Nov 19, 2026 14 days |
| Main Street Concrete Curbing, Sidewalk, and Driveways. | City of Bartow, FL | Florida | Nov 25, 2026 20 days |
| Main Street Concrete Curbing, Sidewalk and Driveways | City of Bartow | Florida | Nov 25, 2026 20 days |
| South Street Sidewalk Project Construction Engineering and Inspection Services | City of Marianna | Florida | Dec 3, 2026 28 days |
| Rollins Street, Bennett Street, & Sixth Street Sidewalk Project | City of Tallahassee | Florida | Dec 8, 2026 33 days |
| Booker Street Sidewalk | Town of Jay | Florida | Dec 8, 2026 33 days |
0 of 3 bids on record since 2026 (0%).
Elite Concrete USA, LLC (2 times); Bejar [email protected] (1 times); M&J Consulting Group Corp (1 times); Regal Contractors Inc (1 times); West Construction, Inc (1 times).
8 as of Nov 5, 2026, including 2027 Sidewalk Repair and Replacement (City of Ormond Beach), due Nov 18, 2026; Winfield Blvd Pedestrian Sidewalk and Bridge (City of Margate), due Nov 19, 2026; Rudy Hubbard Way Sidewalk Improvements (City of Tallahassee), due Nov 19, 2026.
A free Lakewave account shows every open bid matched to the work you do, the results when they close, and the contracts ending that will become the next round.
Create a free accountBid tabulations across 28 states in one place: who bid, what they bid, who was low.
Which firms you meet most, and how far off the low bid you have been.
Open bids matched to the kind of jobs you have bid on, the day they post.
Agencies whose contracts for your kind of work end soon, months before the bid.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Results are as the agency published them in its bid tabulation; apparent low bidder is not always the award. Firms are named as they appear on the tabulation; no individuals are named. Check the source before acting. See something wrong? Tell us and we will correct it.