· rebuilt nightly from public records
Sunshine Land Design Inc has 4 public construction bids on record since 2026 and was low bidder on 0 (0%); the typical gap to the low bid was 55.9%.
Sunshine Land Design Inc bids on public construction work in Florida since 2026, from the bid tabulations agencies publish: each job, what Sunshine Land Design bid, the low bid and who placed it.
Bid tabulations naming Sunshine Land Design since 2026, jobs of $100,000 or more.
Times Sunshine Land Design was the apparent low bidder.
Typical gap to the low bid: 55.9%Open bids in Florida for the kind of work Sunshine Land Design has bid on, with a week or more left.
From the agency's published bid tabulation. Apparent low bidder is not always the award.
| Agency | Job | Decided | Sunshine Land Design bid | Low bidder | Low bid | Gap |
|---|---|---|---|---|---|---|
| City of Port St. Lucie | Construction of Tradition Pkwy and Village Pkwy Intersection Improvements | Oct 10, 2026 | $2,279,026 | R & D Paving, LLC | $1,701,711 | +33.9% |
| City of Port St. Lucie | Northport Utility Site Stormwater Improvements | Aug 4, 2026 | $2,022,222 | CK Contractors & Development | $1,598,440 | +26.5% |
| City of Port St. Lucie | Veterans Park Boat Ramp Milling & Resurfacing | Jul 30, 2026 | $623,514 | GRSC, Inc | $399,985 | +55.9% |
| City of Port St. Lucie | NW Volucia Dr. Sidewalk Project | May 6, 2026 | $1,489,437 | Rion Construction, LLC | $950,086 | +56.8% |
Open bids in Florida whose title shares the kind of work Sunshine Land Design has bid on. Each links to the agency's board.
| Bid | Agency | State | Due |
|---|---|---|---|
| Stormwater Pilot Project | City of Cape Canaveral | Florida | Nov 12, 2026 7 days |
| Iola/GU Parker Road Paving Project | Gulf County | Florida | Nov 12, 2026 7 days |
| Construction Engineering Inspection Services CR 381 Resurfacing | Gulf County | Florida | Nov 12, 2026 7 days |
| Public Water System Operations and Testing for Parks and Recreation | Brevard County | Florida | Nov 13, 2026 8 days |
| General Paving and Drainage Pricing Agreement | Escambia County | Florida | Nov 13, 2026 8 days |
| Madura Five Storm Water Lift Station Rehabilitation Equipment | Santa Rosa County | Florida | Nov 17, 2026 12 days |
| 2027 Sidewalk Repair and Replacement | City of Ormond Beach | Florida | Nov 18, 2026 13 days |
| Parks Court Resurfacing | City of Greenacres | Florida | Nov 19, 2026 14 days |
| Winfield Blvd Pedestrian Sidewalk and Bridge | City of Margate | Florida | Nov 19, 2026 14 days |
| Rudy Hubbard Way Sidewalk Improvements | City of Tallahassee | Florida | Nov 19, 2026 14 days |
| INVITATION TO BID: Highland Village Stormwater Improvements Project (Phase 1) | City of North Miami Beach | Florida | Nov 24, 2026 19 days |
| Main Street Concrete Curbing, Sidewalk, and Driveways. | City of Bartow, FL | Florida | Nov 25, 2026 20 days |
| Main Street Concrete Curbing, Sidewalk and Driveways | City of Bartow | Florida | Nov 25, 2026 20 days |
| Orange Park Neighborhoods Milling and Resurfacing | Clay County | Florida | Nov 30, 2026 25 days |
| Cooper City Stormwater Master Plan (H1470 | 4673-305-P14) | City of Cooper City, FL | Florida | Nov 30, 2026 25 days |
| Orange Park Neighborhoods - Milling and Resurfacing | Clay County | Florida | Nov 30, 2026 25 days |
| County Road 220 Phase 2 Milling and Resurfacing | Clay County | Florida | Nov 30, 2026 25 days |
| County Road 220 Phase 2 – Milling and Resurfacing | Clay County | Florida | Nov 30, 2026 25 days |
| STATE LOBBYING SERVICES FOR WATER AND WASTEWATER INFRASTRUCTURE AND UTILITY POLICY | City of North Miami Beach | Florida | Dec 2, 2026 27 days |
| CR-14 Roadway Resurfacing Design Project Engineering Services | Madison County | Florida | Dec 2, 2026 27 days |
| FY27 Annual Resurfacing Phase 1 (Local Roads) | BAY County | Florida | Dec 2, 2026 27 days |
| 27-04 FY27 Annual Resurfacing Phase 1 (Local Roads) | Bay County, FL | Florida | Dec 2, 2026 27 days |
| CR 466A Fruitland Park Utility Project | Lake County | Florida | Dec 3, 2026 28 days |
| Rural Roadway Paving Improvements | Baker County | Florida | Dec 3, 2026 28 days |
| South Street Sidewalk Project Construction Engineering and Inspection Services | City of Marianna | Florida | Dec 3, 2026 28 days |
| Downtown Street and Parking Lot Resurfacing | City of Perry | Florida | Dec 8, 2026 33 days |
| Rollins Street, Bennett Street, & Sixth Street Sidewalk Project | City of Tallahassee | Florida | Dec 8, 2026 33 days |
| Milling and Resurfacing Continuing Services Construction Contract | Palm Beach County | Florida | Dec 8, 2026 33 days |
| Booker Street Sidewalk | Town of Jay | Florida | Dec 8, 2026 33 days |
| Lower Spring Branch Stormwater Improvements | City of Clearwater | Florida | Dec 9, 2026 34 days |
| FEDERAL LOBBYING SERVICES FOR WATER AND WASTEWATER INFRASTRUCTURE AND UTILITY POLICY | City of North Miami Beach | Florida | Dec 9, 2026 34 days |
| 6th Street Widening and Resurfacing | Franklin County | Florida | Dec 15, 2026 40 days |
| Annual Pavement Management (Preservation, Resurfacing & Reconstruction) with Other Minor… | City of Delray Beach | Florida | Dec 16, 2026 41 days |
0 of 4 bids on record since 2026 (0%).
Environmental Land Development (3 times); Heavy Civil Inc (3 times); CW Roberts Contracting, Inc (2 times); Florida Blacktop Inc (2 times); Ranger Construction Industries, Inc (2 times).
33 as of Nov 5, 2026, including Stormwater Pilot Project (City of Cape Canaveral), due Nov 12, 2026; Iola/GU Parker Road Paving Project (Gulf County), due Nov 12, 2026; Construction Engineering Inspection Services CR 381 Resurfacing (Gulf County), due Nov 12, 2026.
A free Lakewave account shows every open bid matched to the work you do, the results when they close, and the contracts ending that will become the next round.
Create a free accountBid tabulations across 28 states in one place: who bid, what they bid, who was low.
Which firms you meet most, and how far off the low bid you have been.
Open bids matched to the kind of jobs you have bid on, the day they post.
Agencies whose contracts for your kind of work end soon, months before the bid.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Results are as the agency published them in its bid tabulation; apparent low bidder is not always the award. Firms are named as they appear on the tabulation; no individuals are named. Check the source before acting. See something wrong? Tell us and we will correct it.