· rebuilt nightly from public records
Stacy and Witbeck, Inc has 2 public construction bids on record since 2025 and was low bidder on 0 (0%); the typical gap to the low bid was 26.8%.
Stacy and Witbeck, Inc bids on public construction work in California and Washington since 2025, from the bid tabulations agencies publish: each job, what Stacy and Witbeck bid, the low bid and who placed it.
Bid tabulations naming Stacy and Witbeck since 2025, jobs of $100,000 or more.
Times Stacy and Witbeck was the apparent low bidder.
Typical gap to the low bid: 26.8%Open bids in California and Washington for the kind of work Stacy and Witbeck has bid on, with a week or more left.
From the agency's published bid tabulation. Apparent low bidder is not always the award.
| Agency | Job | Decided | Stacy and Witbeck bid | Low bidder | Low bid | Gap |
|---|---|---|---|---|---|---|
| City of Santa Monica | Moss Avenue Pump Station Rehabilitation Project - Construction | Oct 2, 2026 | $8,604,000 | R2B Engineering | $7,699,069 | +11.8% |
| City of Seattle | Bitter Lake Reservoir Improvements | Oct 15, 2025 | $52,221,000 | Shimmick Construction | $41,195,203 | +26.8% |
Open bids in California and Washington whose title shares the kind of work Stacy and Witbeck has bid on. Each links to the agency's board.
| Bid | Agency | State | Due |
|---|---|---|---|
| C5613433-D Grease Trap and Septic Tank Pumping Services | Dept of Corrections & Rehab | California | Nov 16, 2026 10 days |
| Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump… | The Metropolitan Water District of Southern California | California | Nov 17, 2026 11 days |
| Clements Pipeline and Reservoir Phase 2A | Stockton East Water District | California | Nov 19, 2026 13 days |
| Skywest Pump Station AC Unit Replacement | City of Hayward | California | Nov 24, 2026 18 days |
| Malibu Canyon - Las Virgenes Road Pipeline and Pump Station Conceptual Engineering… | Las Virgenes Municipal Water District, CA | California | Dec 4, 2026 28 days |
| Certified Arborist Services for Twin Lakes Pump Station Pipeline Project | Las Virgenes Municipal Water District, CA | California | Dec 4, 2026 28 days |
| Pacheco Pumping Plant Pump 12 Rebuild | Santa Clara Valley Water District | California | Dec 8, 2026 32 days |
| Pump Station 2 Improvements and Modernization (Advertisement Only: No BIDS) | San Diego city | California | Dec 10, 2026 34 days |
0 of 2 bids on record since 2025 (0%).
GMZ Engieering, Inc (1 times); Mehta Mechanical Company, Inc. (MMC, Inc.) (1 times); Metro Builders & Engineers Group, Ltd (1 times); R2B Engineering (1 times); Flatiron Dragados Constructors Inc (1 times).
8 as of Nov 6, 2026, including C5613433-D Grease Trap and Septic Tank Pumping Services (Dept of Corrections & Rehab), due Nov 16, 2026; Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD)… (The Metropolitan Water District of Southern California), due Nov 17, 2026; Clements Pipeline and Reservoir Phase 2A (Stockton East Water District), due Nov 19, 2026.
A free Lakewave account shows every open bid matched to the work you do, the results when they close, and the contracts ending that will become the next round.
Create a free accountBid tabulations across 28 states in one place: who bid, what they bid, who was low.
Which firms you meet most, and how far off the low bid you have been.
Open bids matched to the kind of jobs you have bid on, the day they post.
Agencies whose contracts for your kind of work end soon, months before the bid.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 6, 2026. Results are as the agency published them in its bid tabulation; apparent low bidder is not always the award. Firms are named as they appear on the tabulation; no individuals are named. Check the source before acting. See something wrong? Tell us and we will correct it.