· rebuilt nightly from public records
Lister Construction Inc has 3 public construction bids on record since 2025 and was low bidder on 1 (33%); the typical gap to the low bid was 50.0%.
Lister Construction Inc bids on public construction work in California since 2025, from the bid tabulations agencies publish: each job, what Lister Construction bid, the low bid and who placed it.
Bid tabulations naming Lister Construction since 2025, jobs of $100,000 or more.
Times Lister Construction was the apparent low bidder.
Typical gap to the low bid: 50.0%Open bids in California for the kind of work Lister Construction has bid on, with a week or more left.
From the agency's published bid tabulation. Apparent low bidder is not always the award.
| Agency | Job | Decided | Lister Construction bid | Low bidder | Low bid | Gap |
|---|---|---|---|---|---|---|
| City of Rancho Cordova | 2026 ADA Sidewalk Improvement Project | Oct 22, 2026 | $297,110 | FBD Vanguard Construction, Inc | $198,070 | +50.0% |
| County of Sacramento | Curb, Gutter, and Sidewalk Replacement Project 2025 | Mar 19, 2026 | $910,970 | Imperial Construction & Engineering Inc | $719,174 | +26.7% |
| City of Rancho Cordova | 2024 ADA Sidewalk Improvements Project | Aug 21, 2025 | $284,045 | low bid | $284,045 |
Open bids in California whose title shares the kind of work Lister Construction has bid on. Each links to the agency's board.
| Bid | Agency | State | Due |
|---|---|---|---|
| Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting. | Department of Transportation | California | Nov 17, 2026 11 days |
| Cold plane, HMA, curb ramp, culvert, and modify electrical system. | Department of Transportation | California | Nov 18, 2026 12 days |
| Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project… | Culver City city | California | Nov 19, 2026 13 days |
| Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project… | City of Pasadena | California | Nov 20, 2026 14 days |
| CDBG Sidewalk Improvement Project FY 2027 | City of Pasadena | California | Nov 20, 2026 14 days |
| 2027 Sidewalk, Curb and Gutter Project | Palo Alto city | California | Dec 3, 2026 27 days |
| Const SW,curb ramps,Pvmt,install & Mod Elect systems,drainage systems. | Department of Transportation | California | Dec 16, 2026 40 days |
1 of 3 bids on record since 2025 (33%).
B&M Civil LLC (3 times); Central Valley Engineering & Asphalt, Inc (3 times); FBD Vanguard Construction, Inc (3 times); Imperial Construction & Engineering Inc (2 times); Martin General Engineering, Inc (2 times).
7 as of Nov 6, 2026, including Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting. (Department of Transportation), due Nov 17, 2026; Cold plane, HMA, curb ramp, culvert, and modify electrical system. (Department of Transportation), due Nov 18, 2026; Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive… (Culver City city), due Nov 19, 2026.
A free Lakewave account shows every open bid matched to the work you do, the results when they close, and the contracts ending that will become the next round.
Create a free accountBid tabulations across 28 states in one place: who bid, what they bid, who was low.
Which firms you meet most, and how far off the low bid you have been.
Open bids matched to the kind of jobs you have bid on, the day they post.
Agencies whose contracts for your kind of work end soon, months before the bid.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 6, 2026. Results are as the agency published them in its bid tabulation; apparent low bidder is not always the award. Firms are named as they appear on the tabulation; no individuals are named. Check the source before acting. See something wrong? Tell us and we will correct it.