Horizon Underground LLC has 3 public construction bids on record since 2026 and was low bidder on 0 (0%); the typical gap to the low bid was 7.7%.
Horizon Underground LLC bids on public construction work in California since 2026, from the bid tabulations agencies publish: each job, what Horizon Underground bid, the low bid and who placed it.
Bid tabulations naming Horizon Underground since 2026, jobs of $100,000 or more.
Times Horizon Underground was the apparent low bidder.
Typical gap to the low bid: 7.7%Open bids in California for the kind of work Horizon Underground has bid on, with a week or more left.
From the agency's published bid tabulation. Apparent low bidder is not always the award.
| Agency | Job | Decided | Horizon Underground bid | Low bidder | Low bid | Gap |
|---|---|---|---|---|---|---|
| City of Fullerton | Pacific-Wanda-Louise-Walnut Area Street Rehabilitation | Apr 21, 2026 | $568,080 | Nieves General Engineering, INC | $528,318 | +7.5% |
| The City of Anaheim | Southwest Corner of the Santa Ana Canyon Road & Royal Oak Road Intersection Improvement… | Apr 9, 2026 | $225,791 | Prestige Prime Engineering | $209,682 | +7.7% |
| City of Fullerton | 44797 Curb & Gutter Sidewalk 24-26 | Feb 17, 2026 | $528,860 | Golden Coast Construction | $239,992 | +120.4% |
Open bids in California whose title shares the kind of work Horizon Underground has bid on. Each links to the agency's board.
| Bid | Agency | State | Due |
|---|---|---|---|
| Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting. | Department of Transportation | California | Nov 17, 2026 12 days |
| Professional Design Engineering Services for Safe Streets and Roads for All (SS4A)… | City of San Bernardino | California | Nov 18, 2026 13 days |
| Cold plane, HMA, curb ramp, culvert, and modify electrical system. | Department of Transportation | California | Nov 18, 2026 13 days |
| Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project… | Culver City city | California | Nov 19, 2026 14 days |
| Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project… | City of Pasadena | California | Nov 20, 2026 15 days |
| CDBG Sidewalk Improvement Project FY 2027 | City of Pasadena | California | Nov 20, 2026 15 days |
| Const SW,curb ramps,Pvmt,install & Mod Elect systems,drainage systems. | Department of Transportation | California | Dec 16, 2026 41 days |
0 of 3 bids on record since 2026 (0%).
Developers General Contracting, Inc (2 times); Prestige Prime Engineering (2 times); S&H Civilworks (2 times); Van Engineering Inc (2 times); Nieves General Engineering, INC (2 times).
7 as of Nov 5, 2026, including Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting. (Department of Transportation), due Nov 17, 2026; Professional Design Engineering Services for Safe Streets and Roads… (City of San Bernardino), due Nov 18, 2026; Cold plane, HMA, curb ramp, culvert, and modify electrical system. (Department of Transportation), due Nov 18, 2026.
A free Lakewave account shows every open bid matched to the work you do, the results when they close, and the contracts ending that will become the next round.
Create a free accountBid tabulations across 28 states in one place: who bid, what they bid, who was low.
Which firms you meet most, and how far off the low bid you have been.
Open bids matched to the kind of jobs you have bid on, the day they post.
Agencies whose contracts for your kind of work end soon, months before the bid.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Results are as the agency published them in its bid tabulation; apparent low bidder is not always the award. Firms are named as they appear on the tabulation; no individuals are named. Check the source before acting. See something wrong? Tell us and we will correct it.