· rebuilt nightly from public records
Beador Construction Company, Inc has 2 public construction bids on record since 2025 and was low bidder on 1 (50%); the typical gap to the low bid was 12.5%.
Beador Construction Company, Inc bids on public construction work in California since 2025, from the bid tabulations agencies publish: each job, what Beador Construction bid, the low bid and who placed it.
Bid tabulations naming Beador Construction since 2025, jobs of $100,000 or more.
Times Beador Construction was the apparent low bidder.
Typical gap to the low bid: 12.5%Open bids in California for the kind of work Beador Construction has bid on, with a week or more left.
From the agency's published bid tabulation. Apparent low bidder is not always the award.
| Agency | Job | Decided | Beador Construction bid | Low bidder | Low bid | Gap |
|---|---|---|---|---|---|---|
| The City of Anaheim | Orangewood Avenue Bridge Over the Santa Ana River | Apr 16, 2026 | $26,700,700 | Guy F. Atkinson Construction, LLC | $23,743,815 | +12.5% |
| City of Pasadena | East Side Storm Drain Improvements (76540) | Apr 11, 2025 | $633,300 | low bid | $633,300 |
Open bids in California whose title shares the kind of work Beador Construction has bid on. Each links to the agency's board.
| Bid | Agency | State | Due |
|---|---|---|---|
| West End Stormwater Improvement Project Formal Bid | City of Sand City | California | Nov 12, 2026 7 days |
| Modify existing drainage, replace lighting systems, and install TMS. | Department of Transportation | California | Nov 17, 2026 12 days |
| Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape. | Department of Transportation | California | Nov 18, 2026 13 days |
| Construct treatment BMPs for stormwater mitigation. | Department of Transportation | California | Nov 19, 2026 14 days |
| Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project… | City of Pasadena | California | Nov 20, 2026 15 days |
| Arroyo Simi 4 Rural Bridges Rehabilitation & Scour Mitigation Project | Southern California Regional Rail Authority | California | Nov 23, 2026 18 days |
| Clairemont drive bridge deck repair. | Department of Transportation | California | Dec 1, 2026 26 days |
| Construct sound wall, drainage, and electrical. | Department of Transportation | California | Dec 1, 2026 26 days |
| Construct bridge structure for fish passage restoration. | Department of Transportation | California | Dec 3, 2026 28 days |
| Reconstruct roadway and drainage system, & construct ADA facilities. | Department of Transportation | California | Dec 9, 2026 34 days |
| Replace drainage systems. | Department of Transportation | California | Dec 9, 2026 34 days |
| Place HMA, replace signs, MBGR, TMS and drainage systems. | Department of Transportation | California | Dec 10, 2026 35 days |
| Cold plane AC Pvmt, RHMA-G overlay, landscape, Elect., and drainage. | Department of Transportation | California | Dec 16, 2026 41 days |
| Const SW,curb ramps,Pvmt,install & Mod Elect systems,drainage systems. | Department of Transportation | California | Dec 16, 2026 41 days |
| Colorado River bridge replacement. | Department of Transportation | California | Dec 17, 2026 42 days |
| Interim Shelter - Bridge Housing Bed Expansion | County of Sacramento | California | Dec 31, 2026 56 days |
1 of 2 bids on record since 2025 (50%).
Guy F. Atkinson Construction, LLC (1 times); Reyes Construction (1 times); Steve P. Rados, Inc (1 times); CEM Construction (1 times).
16 as of Nov 5, 2026, including West End Stormwater Improvement Project Formal Bid (City of Sand City), due Nov 12, 2026; Modify existing drainage, replace lighting systems, and install TMS. (Department of Transportation), due Nov 17, 2026; Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape. (Department of Transportation), due Nov 18, 2026.
A free Lakewave account shows every open bid matched to the work you do, the results when they close, and the contracts ending that will become the next round.
Create a free accountBid tabulations across 28 states in one place: who bid, what they bid, who was low.
Which firms you meet most, and how far off the low bid you have been.
Open bids matched to the kind of jobs you have bid on, the day they post.
Agencies whose contracts for your kind of work end soon, months before the bid.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Results are as the agency published them in its bid tabulation; apparent low bidder is not always the award. Firms are named as they appear on the tabulation; no individuals are named. Check the source before acting. See something wrong? Tell us and we will correct it.