Basile USA LLC has 3 public construction bids on record since 2024 and was low bidder on 0 (0%); the typical gap to the low bid was 3.4%.
Basile USA LLC bids on public construction work in Florida since 2024, from the bid tabulations agencies publish: each job, what Basile USA bid, the low bid and who placed it.
Bid tabulations naming Basile USA since 2024, jobs of $100,000 or more.
Times Basile USA was the apparent low bidder.
Typical gap to the low bid: 3.4%Open bids in Florida for the kind of work Basile USA has bid on, with a week or more left.
From the agency's published bid tabulation. Apparent low bidder is not always the award.
| Agency | Job | Decided | Basile USA bid | Low bidder | Low bid | Gap |
|---|---|---|---|---|---|---|
| City of Dania Beach | NW 1ST STREET COMPLETE STREETS IMPROVEMENT LOCAL AGENCY PROGRAM (LAP) PROJECT Re-Bid | Oct 13, 2026 | $2,579,359 | Atc Engineering Inc | $2,506,015 | +2.9% |
| City of Homestead | Basin 11 Pump Station Force Main Project | Jun 18, 2026 | $2,395,865 | Acosta Tractors, Inc | $2,317,499 | +3.4% |
| City of Dania Beach | SOUTHWEST 34TH TERRACE DRAINAGE PROJECT | Dec 18, 2024 | $1,235,921 | JRL UNDERGROUND UTILITIES, INC | $531,763 | +132.4% |
Open bids in Florida whose title shares the kind of work Basile USA has bid on. Each links to the agency's board.
| Bid | Agency | State | Due |
|---|---|---|---|
| Drainage Improvements SW 185th Way & SW 57th Court | Town of Southwest Ranches | Florida | Nov 12, 2026 7 days |
| General Paving and Drainage Pricing Agreement | Escambia County | Florida | Nov 13, 2026 8 days |
| Pump Station R Rehabilitation | City of Key West | Florida | Nov 16, 2026 11 days |
| Sole Source Designation of Agricultural Services International for Rain Bird Pump Station… | Villages Community Development Districts, FL | Florida | Nov 17, 2026 12 days |
| Bonnie Brook Subdivision Drainage Improvements Engineering Design Services | Orange County | Florida | Nov 17, 2026 12 days |
| State Street Drainage Ditch Improvements Project | City of Oldsmar | Florida | Nov 19, 2026 14 days |
| Briley Avenue Septic-to-Sewer | Town of Oakland Town Hall | Florida | Nov 19, 2026 14 days |
| Lift Station 9-A Force Main Extension | Manatee County | Florida | Nov 20, 2026 15 days |
| Lower Croton Road Force Main Project No. 32423 | City of Melbourne | Florida | Nov 23, 2026 18 days |
| Manhole and Sewer Lateral Rehabilitation, As Needed | Hernando County | Florida | Nov 30, 2026 25 days |
| Manhole and Sewer Lateral Rehabilitation, As Needed | Hernando County | Florida | Nov 30, 2026 25 days |
| Drainage Improvements Project at SW 65 Street and SW 65 Terrace | City of South Miami | Florida | Dec 1, 2026 26 days |
| 43rd Street Pump Station Force Main Replacement Design | City of Tampa | Florida | Dec 3, 2026 28 days |
| Inflow and Infiltration Sanitary Sewer Lining, Remediation, and Repair | Cape Coral city | Florida | Dec 3, 2026 28 days |
| Gravity Sewer Line Rehabilitation/Inflow and Infiltration Correction (CG - 06D01626 - 0) | City of Cooper City, FL | Florida | Dec 4, 2026 29 days |
| Septic to Sewer West 9th Street | City of Frostproof | Florida | Dec 8, 2026 33 days |
| Septic to Sewer Wood and Palmetto Ave | City of Frostproof | Florida | Dec 8, 2026 33 days |
| Septic to Sewer Project Phases 4 and 5 | Town of Greenville | Florida | Dec 8, 2026 33 days |
| Construction Services for Cleveland Road Force Main Crossings | City of Jacksonville | Florida | Dec 8, 2026 33 days |
| Lift Station W-27 Upgrades and Force Main Replacement (Project No. 23-8073) | City of Hollywood | Florida | Dec 9, 2026 34 days |
| Septic to Sewer and Water Main Replacement Blvd Heights (Projects No. 22-7114 and 25-5153) | City of Hollywood | Florida | Dec 9, 2026 34 days |
| Avalon Road Reclaimed Water Storage and Repump Facility | Orange County | Florida | Dec 10, 2026 35 days |
| South Service Area Septic to Sewer Project | City of Sebring | Florida | Dec 10, 2026 35 days |
| Purchase & Delivery of Water, Sewer and Irrigation Materials | Cape Coral city | Florida | Dec 14, 2026 39 days |
| Purchase and Delivery of Water, Sewer, and Irrigation Materials | City of Cape Coral | Florida | Dec 14, 2026 39 days |
0 of 3 bids on record since 2024 (0%).
David Mancini and Sons, Inc (2 times); FG Construction, LLC (2 times); Metro Express Inc (2 times); Pabon Engineering, Inc (2 times); Atc Engineering Inc (1 times).
25 as of Nov 5, 2026, including Drainage Improvements SW 185th Way & SW 57th Court (Town of Southwest Ranches), due Nov 12, 2026; General Paving and Drainage Pricing Agreement (Escambia County), due Nov 13, 2026; Pump Station R Rehabilitation (City of Key West), due Nov 16, 2026.
A free Lakewave account shows every open bid matched to the work you do, the results when they close, and the contracts ending that will become the next round.
Create a free accountBid tabulations across 28 states in one place: who bid, what they bid, who was low.
Which firms you meet most, and how far off the low bid you have been.
Open bids matched to the kind of jobs you have bid on, the day they post.
Agencies whose contracts for your kind of work end soon, months before the bid.
Free account · No credit card · Built from public records, refreshed nightly
Compiled from public records and refreshed nightly; last updated Nov 5, 2026. Results are as the agency published them in its bid tabulation; apparent low bidder is not always the award. Firms are named as they appear on the tabulation; no individuals are named. Check the source before acting. See something wrong? Tell us and we will correct it.